My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional larger scale drawing for the proposed expansion. As with the site plan, the <br />applicant acknowledges the draw scale requirement stated on the application form, <br />however, the drawings have been submitted at a scale relevant to the sire of the project <br />and how it connects with the entire landfill site to benefit the review process. <br />The specific elements that are required for inclusion on the site development plan and <br />how they are addressed. on the site development plan are discussed below: <br />3.2.1 Ingress and Egress <br />Existing ingress and egress are shown. No new entrances or exits are required as part of <br />the project. <br />3.2.2 Proposed Structures <br />There are no new proposed structures as part of the proposed expansion. <br />3.2.3 Off=street Parking and Loading Areas <br />Off-street parking is provided within the existing parking lot for the landfill office. This <br />parking lot currently has 20 parking spaces. The proposed perimeter operations road and <br />perimeter access road represent the "loading areas" associated with landfill operations. <br />3.2.4 ScreeningBuffering/Landscape Plan <br />The region surrounding the proposed expansion. consists of rolling terrain, heavily <br />wooded areas, existing berms, and on-going mining operations that effectively screen the <br />area from view without additional screening features. Along the east side of the project <br />area the existing earthen berm that has been planted with trees, provided for the screening <br />of the on-going mining activities will provide year round screening during the active li fe <br />of the proposed expansion. In addition to the on-going mining on the. property to the <br />T:\0742\I40G~CilyAppFeb\FEB Report_final (2).doc -7 -~} <br />
The URL can be used to link to this page
Your browser does not support the video tag.