Laserfiche WebLink
C. UTILITY ISSUES <br /> <br /> 1. The Developer's engineer has assured us that they understand they will need to provide <br /> more watermain looping around the townhouse buildings and apartment buildings for the <br /> strategic placement of hydrants and providing of fire flow. <br /> <br /> 2. The Grading Plan has been revised to show the fire lanes that Bruce West had <br /> requested. Further discussion needs to be held with the Developer to ensure that these <br /> will be kept clear of snow in the winter months and that Bruce West is satisfied that his <br /> equipment can operate on this areas in case of a fire. However, what is shown is <br /> suitable in a preliminary fashion to deal with the issue raised by the Fire Chief. <br /> <br />D. GRADING PLAN ISSUES <br /> <br /> 1. The Developer's engineer has made all of the modifications necessary to address the <br /> issues we raised relative to the last Grading Plan submitted. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Te~. <br />TJM:tw <br /> <br /> Howard R, Green Qompany <br />Ltr 8-22-01 HadickerLtr 8-22-01 Harlicker CONSULTING ENGINEERS <br /> <br />Page 3 <br /> <br /> <br />