My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. ERMUSR 05-16-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
05-16-2006
>
6.5. ERMUSR 05-16-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2009 3:44:09 PM
Creation date
3/31/2009 3:44:09 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apri121.2006 draft <br />1.01 Purpose. This Agreement provides a means for Connexus Energy and the <br />City to serve their distribution loads from the Elk River~l4 Station Bank 2 substation <br />using equipment and facilities as shown in Exhibit A (*** note -need to develop <br />attached hereto and made a part hereof. <br />1.02 Service. Pursuant to this Agreement, the City is obligated to allow <br />Connexus Energy to use the distribution facilities shown in Exhibit A. <br />1.03 Expansion. The City will provide for all design, construction, operation <br />and maintenance of Portion A shown in Exhibit A in a timely fashion. Connexus Energy <br />will reimburse the City for its annual costs for Portion A based on demand ratios per Art. <br />III. The City will provide for all design, operation, construction and maintenance of <br />Portion B shown in Exhibit A at its own expense. Connexus Energy shall provide for all <br />design, operation, construction and maintenance of Portion C as shown in Exhibit A at its <br />own expense. If Connexus Energy requires additional facilities, such as another <br />distribution circuit, it shall require approval from the City. Approval will not be <br />unreasonably withheld. Connexus Energy would do design and construction of <br />additional facilities in Portion C, or alternatively, the City may provide the design and <br />construction. Utilities shall provide proper planning and load forecasting to ensure <br />timely expansion of facilities. <br />1.04 Design Capacity Limit. The Parties agree that the design capacity limits <br />of the Parties facilities will not be exceeded,_and that Connexus Energy_shall limit the <br />Deleted: North <br />- Deleted: until expansions are complete <br />normal (non-emergency) load on it's single feeder to 6 M W unless otherwise mutually <br />agreed to.~(*** Note to Bryan -This is in response to your request to have a cap on the -- Deleted: . <br />Connexus usage. ***) <br />1.05 Power Factor. Each Utility will provide sufficient capacitance and <br />reactive control on its system in order to ensure minimum reactive flow through the <br />interconnection. <br />1.06 Emergencies. Each Utility shall, as soon as possible, notify the system <br />operators of the other Party when it requires emergency electric service which may <br />- ----- ,- Deleted:. <br />require Connexus Energy or the City to exceed their normal firm demand, Notification <br />of emergency service is required so that: I the capability of the substation is not <br />-- - .- Deleted: <br />exceeded, and 2)Yhe eak demands used for substation cost sharing can be adiusted as ",-""" <br />-----p- - - ----------- ------ - ----------- <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.