April 21, 2006 draft <br />appropriate to reflect only non-emergency service. Connexus Energy shall secure <br />approval from the City before emergency service is put in place. Approval will not be <br />unreasonably withheld. <br />1.07 Access and Easements. The Parties hereby grant each other access to the <br />immediate interconnection location for the purpose of inspecting, constructing, operating, <br />maintaining, and repairing Connexus Energy's and the City's facilities. <br />1.08 Additional Backup Interconnection Points. Additional backup <br />interconnection points may be incorporated into this Agreement by means of a <br />Supplement or Supplements to this Distribution Interconnection Agreement. <br />1.09 Transmission or Transformer Failure. In case of transmission or <br />transformer loss of power, both utilities will make reasonable efforts to provide back up <br />power and energy from their respective distribution circuits. <br />ARTICLE II <br />OPERATION AND MAINTENANCE <br />2.01 Operation and Maintenance Responsibility. Each Party will be <br />responsible for the operation and maintenance of its own facilities. Both Utilities shall be <br />responsible for all annual costs associated with Portion A in Exhibit A as outlined in Art. <br />III. <br />2.02 Operation and Maintenance Costs. Each Party shall be responsible for <br />the operation and maintenance costs of the interconnection facilities it owns as shown in <br />Portions B and C in Exhibit A. A party may, however, perform certain operation and <br />maintenance activities on non-owned facilities at the request of the owning Party upon <br />such terms and conditions as shall be otherwise agreed to. <br />2.03 Normal Operation. The interconnections will be operated normally <br />closed and only be opened by mutual agreement of the Utilities system operators. <br />ARTICLE III <br />.- Deleted: DEMAND <br />COST SHARING/ANNUAL FEES <br />4 <br />