My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. ERMUSR 05-16-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
05-16-2006
>
6.5. ERMUSR 05-16-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2009 3:44:09 PM
Creation date
3/31/2009 3:44:09 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
View images
View plain text
April 21, 2006 draft <br />This Distribution Interconnection Ageement, hereinafter referred to as <br />- Deleted: 2002 <br />"Agreement", is made and entered into this day of 006, by ___-.---' <br />and among the Elk River Municipal Utilities of the City of Elk River, a municipal <br />corporation of the State of Minnesota, hereinafter referred to as the "City"; and Connexus <br />Energy, a Minnesota cooperative corporation. Said parties are sometimes referred to <br />herein individually as "Party" and collectively as "Parties:; the City and Connexus <br />Energy are sometimes referred to herein individually as "Utility" and collectively as <br />"Utilities". <br />WITNESSETH <br />0.01 WHEREAS, City owns, operates and maintains an electric distribution <br />system and other facilities and is responsible for providing electrical energy to its <br />customers within and adjacent to the City limits; and <br />0.02 WHEREAS, Connexus Energy owns, operates and maintains an electric <br />distribution system and other facilities and is responsible for providing electrical energy <br />to its consumer-owners in service areas defined and certified by the Minnesota Public <br />Utilities Commission; and <br />0.03 WHEREAS, Connexus Energy and the City each serve their customers <br />and consumer owners by means of the 12.5 kilovolt distribution feeders in adjacent areas; <br />and <br />0.04 WHEREAS, City is constructing a new 69/12.5 kilovolt 15/28 MVA <br />distribution substation named Elk River 14 Station Bank 2 substation; and <br />0~5 WHEREAS, the City is willing_to allow Connexus Energy_to use_the Elk <br />River ,l4 Station Bank 2 substation. <br />NOW THERFORE, the Parties agee as follows: <br />ARTICLE I <br />FACILITIES AND SERVICES <br />Deleted: 04 <br />.- Deleted: North <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).