My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.10. 7.11. 7.12. SR 06-19-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-19-1995
>
7.10. 7.11. 7.12. SR 06-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2008 4:20:48 PM
Creation date
10/27/2008 4:20:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Ach <br />May 18, 1995 <br />• Page Six <br />- Add a hydrant between Lots 13 and 14, Block 3. <br />- Eliminate the hydranf,between Lots 11 and 12, Block 3. <br />- Add a hydrant between Lots 7 and 8, Block 5. <br />- Add a hydrant between Lots 26 and 27, Block 5. <br />- Eliminate the hydrant between Lots 32 and 33, Block 5. <br />- Add a hydrant at the sear of the 195th Circle cul-de-sac. <br />- Eliminate the hydrant) at the corner of Lot 23, Block 3. <br />- Add a hydrant at the tear of the 195th Court cul-de-sac. <br />- Add a hydrant between Lots 36 and 37, Block 4. <br />- Eliminate the hydrant between Lots 34 and 35, Block 4. <br />- Add a hydrant at the Corner of Lot 6, Block 4. <br />- Eliminate the hydrant at the comer of Lot 18, Block 4. <br />- Add a hydrant at the tear of the Tipton Court cul-de-sac. <br />- Add a hydrant at the reaz of the 196th Circle cul-de-sac. <br />^ Ultimate water service to this plat will require a booster pumping station. <br />This is necessary since the bulk of the development falls within the high <br />pressure water system which requires a water tower for adequate pressure. <br />The Elk River Municipal Utilities has programmed construction of the water <br />• tower in this area for the year 1999/2000. In order to develop prior to that, <br />the booster pumping statir~» is necessary. <br />Design of the booster citation needs to provide for normal domestic <br />consumption plus fire flow. The design should be similaz to the Dee~eld <br />Third booster station wlpich has redundant small pumps for domestic <br />consumption and a large ~~000 gallon per minute fire flow. <br />It is not clear whether or'not the booster pumping station will need to be <br />provided for the first phase. <br />^ At the access to the plat ^n County Road 77, provisions in the watermain <br />need to be provided for future extension to the south. <br />^ A loop of watermain from 195th Court to the existing trunk line in the <br />railroad bed should be pCOVided, but since the since the system will be <br />served initially from a booster pumping station, a valve will need to be <br />provided and closed until such time that the water tower for this azea is <br />constructed. <br /> <br />230/258-1802.may <br />
The URL can be used to link to this page
Your browser does not support the video tag.