My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.10. 7.11. 7.12. SR 06-19-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-19-1995
>
7.10. 7.11. 7.12. SR 06-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2008 4:20:48 PM
Creation date
10/27/2008 4:20:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Ach <br />May 18, 1995 <br />• Page Seven <br />It is likely that a trunk wat~main loop will need to be provided through this <br />development. We are currently reviewing the City's model of their water <br />system and will provide t,~tis information to the Developer as soon as it is <br />available. <br />Connection to the existing',sanitary sewer system needs to be by an outside <br />drop rather than an inside'drop. <br />D. Other Issues <br />• <br /> <br />The Developer will havq to provide the normal street signs and street <br />lighting as recommended py the Elk River Municipal Utilities. <br />The phasing as described Iby the Developer is different than shown on the <br />submittal. Apparently Phase I will be at the south part of the development <br />near 193rd Avenue. This will likely only have one means of ingress and <br />egress, that being CSAH 1. It is important that when the second phase of <br />the development is constntd~ed, it be in a location that provides for a second <br />means of ingress and egre$SS from County Road 77. <br />This site will require aaj~NPDES permit from the Minnesota Pollution <br />Control Agency. <br />The transportation sectidrt of the Growth Management Plan showed <br />Highland Road coming th~'ough this property and curving down to connect <br />with CSAH 1 east of the railroad pathway. The draft Comprehensive <br />Transportation Plan shovyed an alternative of a Highland Road extension <br />crossing the railroad pat8~, and connecfing up with CSAH 1 further to the <br />west. At the time that )~1CPazk Center was developed, Freeport Avenue <br />through that development was not aligned with Highland Road. This was <br />an attempt to downplay the collector nature of Highland Road as an east- <br />west route between Prodbr and Jackson. Given these actions previously <br />taken, we would recommend that it is not appropriate to consider the <br />westerly extension of Highland across the railroad alignment, but rather a <br />layout similar to what is JDroposed with this Preliminary Plat. <br />Sherburne County has indicated they would like to acquire an additional 17 <br />feet from this plat where ~t abuts County Road 77. <br />230/?58-1802.may <br />
The URL can be used to link to this page
Your browser does not support the video tag.