My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. - 5.11. SR 03-25-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
03/25/1996
>
5.4. - 5.11. SR 03-25-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:15 AM
Creation date
2/6/2003 4:06:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Assistance and Construction: <br /> <br />Technica] Asslstance to be provided by: SCS <br />Registered Engineer or Consulting Engineer <br /> <br />Project to be constructed by: <br /> <br />Applicant X <br /> <br />2/86 <br /> <br />X Local Government <br /> <br />Private Contractor <br /> <br />Operation and Maintenance: <br /> <br />Applicant will: be responsible for and will operate, or have operated, <br />without additional cost to the SWCD, all measures included in this project <br />for a minlmum of 10 years. In addition, the applicant will be <br />responsible for and promptly perform or have performed, without additional <br />costs to the SWCO, a]l maintenance of the measures included in this <br />project for a minimum of 10 years. (Maintenance must be for a minimum <br />of ten years). <br /> <br />Sherburne Soil and Water Conservation District will: notify the <br />applicant in writing upon receipt of formal approval of the project from <br />the State Board. The SWCD will perform an annual inspection of the <br />project until termination of its minimum effective life. {Refer to <br />Appendices IV and V). <br /> <br />Mutual Agreeable Plan: <br /> <br /> This work plan has been reviewed and approved at the meeting <br />of the E1kl~m~Cit¥O~ (applicant), and $ 25.000,00 -is encumbered as <br />the applicant's share of the cost of installing this project. <br /> <br /> Signed <br />(Applicant) <br /> Title <br /> <br />This work plan has been reviewed and approved at the <br />meeting of the Shesbusne Soil and Water Conservation District. <br /> <br />(SWCD) <br /> <br />Signed <br /> <br />Chairperson <br /> <br />Sherburne <br /> <br />SWCD <br /> <br />E-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.