My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 04-23-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
04/23/2001
>
4.2. SR 04-23-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:13 AM
Creation date
2/5/2003 9:25:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/23/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder <br />Triple Combination Pumper Specifications for thc 28 Complies <br /> <br />City of Elk River Minnesota Yes No <br />BATTERY COMPARTMENTS <br />Batteries shall be placed on non-corrosive mats and be stored in well-ventilated compartments <br />located under the cab. Compartments shall be totally enclosed with removable covers. <br />Heavy-duty battery cables shall be used to provide maximum power to the electrical system. <br />Cables shall be color-coded. <br />Battery terminal connections shall be coated with anti-corrosion compound. Battery solenoid <br />terminal connections shall be encapsulated with semi-permanent rubberized compound. <br />JUMPER STUDS <br />One (1) set of battery jumper studs with plastic color-coded covers shall be installed on the <br />front side of battery box on drivers side. This shall allow enough room for easy jumper cable <br />access. A tag shall be provided for positive/negative terminals. <br />BATTERY CHARGER <br />A single system battery charger shall be provided. The charger shall have a maximum output <br />of 20 amps. A charge indicator shall be provided on the driver side seat riser to show if <br />charger is operating. <br />The battery charger shall be wired to the 120-volt shoreline to activate automatically when <br />power is connected. Battery charger shall be located in the front left body compartment, <br />mounted in the upper forward portion of the compartment. <br />ALTERNATOR <br />An alternator shall be provided. It shall have a rated output current of 340 amp as measured <br />by SAE method J56. Also, it shall have a custom three (3)-set point voltage regulator. The <br />alternator shall be connected to the power and ground distribution system with heavy-duty <br />cables sized to carry the full rated alternator output. <br />EI,ECTRONIC LOAD MANAGER <br />An electronic load management (ELM) system shall be provided that monitors the vehicles 12- <br />volt electrical system, automatically reduces the electrical load in the event of a low voltage <br />condition, and automatically restores the shed electrical loads when the low voltage condition <br />expires. This ensures the integrity of the electrical system. The ELM shall monitor the <br />vehicle's voltage while at the scene (parking brake applied). <br />The system shall have the following features: <br />System voltage monitoring <br />- Load manager on/off switch. <br />Page 28 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.