My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 06-02-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
06-02-2008
>
9.1. SR 06-02-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2008 8:52:39 AM
Creation date
5/30/2008 8:52:38 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
199-~':Avcnuc Corridn~ l'pdare <br />~unc 3, 2003 <br />Page 4 <br />6. Resteipin~ of existing 193` Avenue <br />The plan calls for the tcsttiping of existing 193" Avenue beaveen Evans <br />Strcct and Auburn Street to a 3-lane design with a center left him lane, which <br />will provide for vehicles waiting to Inakc left turns at intersections or left <br />nuns into driveways. <br />E. Project Schedule <br />Prclinml:uy plans have already been reviewed by MnDOT. ~Y'e have received a <br />series of general comments and axe making changes to the plans before final <br />submittal. We are coordinating soil borings nom thatwc have access to the property <br />which would be a ncccssaly part of the final plan approval. The other item we will <br />subinit wide the final plans once a determination is made nn dIe Buxandt temporary <br />casement is Right-of-~~Iay Certificate No. 1 which assures 1~nDOT and the h'edexal <br />1 Tighma~ administration that the city controls all of the sight-of-way nccessatp to <br />build the project. ~1e would expect that we will have final approval of the plans and <br />authorization to bid them contingent upon receipt of the Corps of IJngineexs pernut <br />fox the wetland issue withui 60 - 90 days. This would allow fox a late stnnlnet bid <br />with construction beginning in the fall of 2008 and carxvizig nito the 2009 <br />construction season, at which time the improvement would be completed. <br />~ 1'n~2nuudmp > ProjA2008 Impan'cmc~[lxoj¢[sV193n1 '` C.omdo:A0!> 0? 08 cc mmno.aoc <br />