My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 01-28-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
01/28/2002
>
4.4. SR 01-28-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:03 AM
Creation date
12/17/2002 4:41:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12-foot wide lanes and a 4-foot wide reaction area next to the curb and gutter. The <br />proposed street section for this road is in accordance with City and MnDOT <br />requirements. Based on typical soils in Elk River, the proposed pavement section <br />consists of 8 inches of Class 5 aggregate base, 2 inches of bituminous base course, <br />and 2 inches of bituminous wear course. The proposed street section will be verified by <br />a geotechnical investigation. <br /> <br />Proposed improvements also include a 6-foot wide sidewalk located on the west side of <br />Zane Street. Estimated costs for sidewalk have been included in the street construction <br />cost. <br /> <br />Sanitary Sewer <br />The proposed sanitary sewer improvements, as shown on Exhibit 5, consist of <br />extending an 8-inch lateral sanitary sewer from the current termination point at the north <br />end of the Mississippi Ridge Addition. <br /> <br />The proposed sanitary sewer alignment along Zane Street would provide service to the <br />adjacent properties, allowing for the discontinued use of the on-site sewer systems <br />currently being used by the businesses. Stubs would be provided to the two <br />undeveloped properties. <br /> <br />Watermain <br />The proposed watermain improvements, as shown as Exhibit 6, consist of extending a <br />10-inch trunk watermain from the current termination point at the north end of the <br />Mississippi Ridge Addition. The watermain would be connected to the 16-inch stub <br />under Trunk Highway 10 near the Americlnn, creating a looped system. <br /> <br />Storm Sewer <br />The proposed typical section for Zane Street includes barrier curb. The existing storm <br />sewer system is adequate to handle the drainage from the new road but will need to be <br />modified slightly to collect the runoff. The proposed storm drainage improvements are <br />shown as Exhibit 7. Pipe material will be reinforced concrete. Inlets will be standard <br />catch basins built into the proposed concrete curbing. <br /> <br />FEAS-STUDY 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.