My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-21-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
05/21/2007
>
5.4. SR 05-21-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:55 AM
Creation date
5/18/2007 2:36:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ 2.3.2 ADMINISTRATION <br /> <br />~ 2.3.2.1 Those peltio",: of the V' orlc thut tb€ COIwtrection Manager aoes net <lIGto_rily perform wkh the <br />ConstruNion Manager's awn personnel shall he pOTformed under slIbeoRlraetG or by o!her ""propriat. agreements <br />'Akh the Canstruction Manager. The Construction Manager shall obtain bids frem S1lllGoRlractors and from "'"pliers <br />-ef.Prime Contracts and am-cements with sunnliers furnishin2" materials or equipment fabricated to a special design <br />for the Work from tbe list pre,,-iollsly reviewed and, atter analyzing slleh bids, ,ball deliyer 'lieh bids-to the OW1ler <br />and Architect. The Owner will th"" deteonine, with tbe ad...ietHJftlle Construetie.e HallagOT and ,..eject t&tlle <br />reaGonaBle aBjectioll aflbe /\rchitect, 'lihie" bids Vim he accej>lcd. The Owner nlaj' aeeignate specitic personG or <br />entities frem '"'halll the Constr'.!ction Manager shall obtain bids~bowe"-er, ifllle Guarantoed Maximum Price hus <br />heell estahlisbed. the OTHer may Hot prohibit !he COHGtr,lctioe Manager f~om ohtainiHg hias fmm otber qualilied <br />hiaaer... Tile CollGtrHctioH Manager shnlHlet be required te coRlract '1, ith anyone te whom the Co",otruetioe Manager <br />ha, rea.;",,""le "ejection. <br /> <br />~~.Jfffie.-G"iHanteed MOJdmnlll PriGe ha" been established and a specific bidder among Ibose v'llese Ioias are <br />deli.,.ered by the CO".;tnletion Manager t<l tile Ow"er and ,A.white"! (I) is reeemmen(~ed t8 tile OV.""er Ioy the <br />CoestrHotion Manager; (2) is qualifieat8perfarm that portien of the Worl,; and (3) has submitted a hid which <br />c0nforms to the requirements of the CeI:ttfaet DeeHmeflt: .,,;i.thout f0~:erYatiom; or c;(ceptiol1s, hat the O':,-ner requires <br />th.at uoothcr bid be accepted, tliea the C8aSl'l'Hetlen .Manager may require that a change in ~he -\\'er1~ be issued to <br />adjHsl!he CORtra.: Time ""d the Guar-anteea !.1a"im.lllPrice 10) ilie difti.,renoe het."..n the bid "fthe person or <br />en~ity recommended to the OV.'IU~r by the CeRs~rneti0n ~1ana;er and the ~...mOlJ.Rt of the s::JbeOilt1'aet aT other <br />agreGJ'Rent actually signed ',,'ith the per.;on or entity designatea h)' ilie Owncr.g 2.3.2.3 S1lllcontraet.J and agreement: <br />with suppliers furniGhing materials or equipnl€n: fahrieated 10 a ""ecia! deGign shall conform to Ibe payment <br />provisions of Sections 7.1.8 and 7.1.9 ana ,hall not be [!'\'Braed on ilie basis ofeoG: pl..s a fee without the prior <br />consont of the O.,;neLIJ.,.2.< <br /> <br />92.3.2.4& 2.3.2.2 The Construction Manager shall schedule and conduct meetings at which the Owner, Architect, <br />Construction Manager and appropriate Subcontractors can discuss the stalus of the Work. The Construction <br />Manager shull prepare and promptly distribute meeting minutes. <br /> <br />~ ~2.3.2.3 Promptly after Ibe Owner's acceptance of Ibe Guaranteed Maximum Price proposal, the Construction <br />Manager sball prepare a schedule in accordance with Section 3. I 0 of A20l "L 1997, including the Owner's <br />occupancy requirements. <br /> <br />~ ~2.3.2.4 The Construction Manager shall provide monlbly written reports to Ibe Owner and Architect on the <br />progress of tbe entire Work. The Construction Manager shall maintain a daily log containing a record of weatber, <br />Subcontractors working on the site, number of workers, Work accomplished, problems encountered and other <br />similar relevant data as Ibe Owner may reasonably require. The log shall be available to the Owner and Architect. <br /> <br />~ ~2.3.2.5 The Construction Manager shull develop a system of cost conlrol for Ibe Work, including regular <br />monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. The <br />Construction Manager shull identify variances between aclual and estimated costs and report Ibe variances to tbe <br />Owner and Architect at regular intervals. <br /> <br />Sk:l.2.6li,,!\vitlr~t~1l<lillg,~1l}'lhil1&. to the contra~herein,alLc,onlracts for the constmction "ffueW ork shaUbe <br />comnetitivelv bid and award bY.fue.Q.'Yllex.P\ll'sll~nt to IVlinnesotaStatutes Section47l 345 TheiJi4<!,)cuments <br />~hall inform all hidders that O'Mler has the ri2ht to reiect some or all bids and the ripht to assiQu to Construction <br />ManaQ:er all contracts for the Wark. At the time the_Q.W!l_~.,.~~_(;~nts the .Glla.ranteed Maximum Price nursual!ttQ <br />82326 Owner shall assign the contracts bv senarate a!Ireement to the Construction Manager who shall then <br />assume the rit:rhts and ohli9ations of the "Contractor" in AlA Docump.nts A201 ™ - 1997. <br /> <br />~ 2.4 PROFESSIONAL SERVICES <br />Section 3.12.10 of A201 T~1997 shall apply to bolb Ibe Preconstruction and Construction Phases. <br /> <br />~ 2.5 HAZARDOUS MATERIALS <br />Section 10.3 of A201T~1997 shall apply to bolb the Preconstruction and Construction Phuses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.