Laserfiche WebLink
<br />~ 2.2.3 The estimated Cost of the Work shall include the Construction Manager's contingency, a sum established by <br />the Construction Manager for the Construction Manager's exclusive use to cover costs arising under Section 2.2.2 <br />and other costs which are properly reimbursable as Cost of the Work but not the basis for a Change Order. <br /> <br />~ 2.2.4 BASIS OF GUARANTEED MAXIMUM PRICE <br />The Construction Manager shall include with the Guaranteed Maximum Price proposal a written statement of its <br />basis, which shall include: <br />.1 A list of the Drawings and Specifications, including all addenda thereto and the Conditions of the <br />Contract, which were used in preparation of the Guaranteed Maximum Price proposal. <br />.2 A list of allowances and a statement of their basis. <br />.3 A list of the clarifications and assumptions made by the Construction Manager in the preparation of <br />the Guaranteed Maximum Price proposal to supplement the information contained in the Drawings <br />and Specifications. <br />.4 The proposed Guaranteed Maximum Price, including a statement of the estimated cost organized by <br />trade categories, allowances, contingency, and other items and the Fee that comprise the Guaranteed <br />Maximum Price. <br />.5 The Date of Substantial Completion upon which the proposed Guaranteed Maximum Price is based, <br />and a schedule of the Construction Documents issuance dates upon which the date of Substantial <br />Completion is based. <br /> <br />~ 2.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum <br />Price proposal and the written statement of its basis. In the event that the Owner or Architect discover any <br />inconsistencies or inaccuracies in the information presented, they shall promptly notify the Construction Manager, <br />who shall make appropriate adjusttnents to the Guaranteed Maximum Price proposal, its basis, or both. <br /> <br />~ 2.2.6 Unless the Owner accepts the Guaranteed Maximum Price proposal in writing on or before the date specified <br />in the proposal for such acceptance and so notifies the Construction Manager, the Guaranteed Maximum Price <br />proposal shall not be effective without written acceptance by the Construction Manager. <br /> <br />~ 2.2.7 Prior to the Owner's acceptance of the Construction Manager's Guaranteed Maximum Price proposal and <br />issuance of a Notice to Proceed, the Construction Manager shall not incur any cost to be reimbursed as part of the <br />Cost of the Work, except as the Owner may specifically authorize in writing. <br /> <br />~ 2.2.8 Upon acceptance by the Owner of the Guaranteed Maximum Price proposal, the Guaranteed Maximum Price <br />and its basis shall be set forth in Amendment No. I. The Guaranteed Maximum Price shall be subject to additions <br />and deductions by a change in the Work as provided in the Contract Documents, and the Date of Substantial <br />Completion shall be subject to adjusttnent as provided in the Contract Documents. <br /> <br />~ 2.2.9 The Owner shall authorize and cause the Architect to revise the Drawings and Specifications to the extent <br />necessary to reflect the agreed-upon assumptions and clarifications contained in Amendment No.1. Such revised <br />Drawings and Specifications shall be furnished to the Construction Manager in accordance with schedules agreed to <br />by the Owner, Architect and Construction Manager. The Construction Manager shall promptly notify the Architect <br />and Owner if such revised Drawings and Specifications are inconsistent with the agreed-upon assumptions and <br />clarifications. <br /> <br />~ 2.2.10 The Guaranteed Maximum Price shall include in the Cost of the Work only those taxes which are enacted at <br />the time the Guaranteed Maximum Price is established. <br /> <br />~ 2.3 CONSTRUCTION PHASE <br />~ 2.3.1 GENERAL <br />~ 2.3.1.1 The Construction Phase shall commence on the earlier of:( I) the!.!R\1!) Owner'~s acceptance of the <br />Construction Manager~) Guaranteed Maximum Price prepesalPronosal and Q.~er's issuance of a-Notice to <br />Proceed;;-Qf <br />R-l----tho OWflers first aothorizatiofl to the Con'fmetioll Hllaager to: <br />(a) 3'.\3Id a Gubeontract, or <br />(h) ""deffalee "o""traetion "'-ork with the CoRStrH"tioaManag.r's own lorees, or (e) is,",. a <br />purehase order for materials or equipFA:ellt reEfl::lirea fef the \VOIle. <br />