Laserfiche WebLink
<br />ARTICLE 3 OWNER'S RESPONSIBILITIES <br />9 3.1 INFORMATION AND SERVICES <br />93.1.1 The Owner shall provide full infonnation in a timely manner regarding the requirements of the Project, <br />including a program which sets forth the Owner's objectives, constraints and criteria, including space requirements <br />and relationships, flexibility and expandability requirements, special equipment and systems, and site requirements. <br /> <br />93.1.2 The Owner shall, at the written request of the Construction Manager prior to commencement of the <br />Construction Phase and thereafter, furnish to the Construction Manager reasonable evidence that fmancial <br />arrangements have been made to fulfill the Owner's obligations under the Contract. Furnishing of such evidence <br />shall be a condition precedent to commencement or continuation of the Work. After such evidence has been <br />furnished, the Owner shall not materially vary such financial arrangements without prior notice to the Construction <br />Manager. <br /> <br />93.1.3 The Owner shall establish and update an overall budget for the Project, based on consultation with the <br />Construction Manager and Architect, which shall include contingencies for changes in the Work and other costs <br />which are the responsibility of the Owner. <br /> <br />9 3.1.4 STRUCTURAL AND ENVIRONMENTAL TESTS, SURVEYS AND REPORTS <br />In the Preconstruction Phase, the Owner shall furnish the following with reasonable promptness and at the Owner's <br />expense. Except to the extent that the Construction Manager knows of any inaccuracy, the Construction Manager <br />shall be entitled to rely upon the accuracy of any such information, reports, surveys, drawings and tests described in <br />Sections 3.1.4.1 through 3.1.4.4 but shall exercise customary precautions relating to the perfonnance of the Work, <br />Provided however Owner does not 9"uarantee the accuracy of information nrovicleci reQ"ardimz nTivate utility <br />~ocations_ <br /> <br />9 3.1.4.1 Reports, surveys, drawings and tests concerning the conditions of the site which are required by law. <br /> <br />93.1.4.2 Surveys describing physical characteristics, legalliruitations and utility locations for the site of the Project, <br />and a written legal description of the site. The surveys and legal infonnation shall include, as applicable, grades and <br />lines of streets, alleys, pavements and adjoining property and structures; adjacent drainage; rights-of-way, <br />restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, <br />dimensions and necessary data pertaining to existing buildings, other improvements and trees; and information <br />concerning available utility services and lines, both public and private, above and below grade, including inverts and <br />depths. All infonnation on the survey shall be referenced to a project benchmark. <br /> <br />9 3.1.4.3 The services of a geotechnical engineer when such services are requested by the Construction Manager. <br />Such services may include but are not limited to test borings, test pits, determinations of soil bearing values, <br />percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, including necessary <br />operations for anticipating subsoil conditions, with reports and appropriate professional recommendations. <br /> <br />9 3.1.4.4 Structural, mechanical, cheruical, air and water pollution tests, tests for hazardous materials, and other <br />laboratory and environmental tests, inspections and reports which are required by law. <br /> <br />93.1.4.5 The services of other consultants when such services are reasonably required by the scope of the Project and <br />are requested by the Construction Manager. <br /> <br />93.2 OWNER'S DESIGNATED REPRESENTATIVE <br />+lle-Owner shall designate in writing aan.Qwner's representative woo cllaH hlWe-{))'Press authority to bind U1e <br />O\PHer ....'itll re::,.peet to all matters~0quiriflf the O'.Yl1,er's appre':al or autherizati-on. This. represeHtativB sha]] haye t-he <br />authority to melee deuis1:0HS--Hll behalf of the O'l.'uer cElfleeraifl& ec.timat8s .and sehed:.lles, eeHstructicm budge-ts-;-atld <br />chan!;:0s in the '.vork,and-shaU render such decisiElfls premptly and furnish infermatiCtH e;tfleditiously, so as ta--aveid <br />unreasonable delay in the services or \Vork oft.he Ceastftl\2tion J\hRager. EKeept as othef'.?:ise provided in,Seetien <br />'1.2.1 of ,UOITM J 997, the-Arcll;teet does not have ouch alltllerity",ith authority to make dav-to,d.~v decision~ <br />re2"ardin,gJhe Work inG1IJdinRnannroval offield directives and minor chanl!es_in the Work Chanl!e orderS..J!.Jl.d <br />Con~tmction Cham!e Directive_~_shalln~guire aonroval of the Elk River CitY,..CQJJncil unles~ authori~ is otherwis.e. <br />deleQaled bv the Council. The.Q.wner'S.representative shall be fhllv acouaint.e.d..with the Project and shall furnish <br />th..e.infurmation ang. services regyjred."Q,[t.he...O\VTIer so as not to ImreasonablLd.elav the Cons-mIction ryianaQer's <br />Services and/or the V{ qrk. If the O_wne.r.,.GhatHte.sjts renresentative the Owner ,5_balLnotifv the Construction MaJ)a.,g~.r <br />in advance in writi!ll! of such cha.J},g~. <br />