My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-21-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
05/21/2007
>
5.4. SR 05-21-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:55 AM
Creation date
5/18/2007 2:36:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ 2.1.5.2 When Schematic Design Documents have been prepared by the Architect and approved by the Owner, the <br />Construction Manager shall prepare, for the review of the Architect and approval of the Owner, a more detailed <br />estimate with supporting data. During the preparation of the Design Development Documents, the Construction <br />Manager shall update and refine this estimate at appropriate intervals agreed to by the Owner, Architect and <br />Construction Manager. <br /> <br />~ 2.1.5.3 When Design Development Documents have been prepared by the Architect and approved by the Owner, <br />the Construction Manager shall prepare a detailed estimate with supporting data for review by the Architect and <br />approval by the Owner. During the preparation ofthe Construction Documents, the Construction Manager shall <br />update and refme this estimate at appropriate intervals agreed to by the Owner, Architect and Construction Manager. <br /> <br />~ 2.1.5.4 If any estimate submitted to the Owner exceeds previously approved estimates or the Owner's budget, the <br />Construction Manager shall make appropriate recommendations to the Owner and Architect. <br /> <br />~ 2.1.6 PRIME CONTRACTORS AND SUPPLIERS <br />The Construction Manager shall seek to develop Prime Contractor interest in the Project and shall furnish to the <br />Owner and Architect for their information a list of possible mnltillle Prime Contractors, including suppliers who <br />are to furnish materials or equipment fabricated to a special design, from whom proposals will be requested for each <br />principal portion of the Work. The Architect will promptly reply in writing to the Construction Manager if the <br />Architect or Owner know of any objection to such Prime Contractor or supplier. The receipt of such list shall not <br />require the Owner or Architect to investigate the qualifications of proposed Prime Contractors or suppliers, nor <br />shall it waive the right of the Owner or Architect later to object to or reject any proposed Prime Contractor or <br />supplier _ <br /> <br />~ 2.1.7 LONG.LEAD.TlME ITEMS <br />The Construction Manager shall recommend to the Owner and Architect a schedule for procurement oflong-Iead- <br />time items which will constitute part of the Work as required to meet the Project schedule. If such long-lead-time <br />items are procured by the Owner, they shall be procured on terms and conditions acceptable to the Construction <br />Manager. Upon the Owner's acceptance of the Construction Manager's Guaranteed Maximum Price proposal, all <br />contracts for such items shall be assigned by the Owner to the Construction Manager, who shall accept <br />responsibility for such items as if procured by the Construction Manager. The Construction Manager shall expedite <br />the delivery oflong-lead-time items. <br /> <br />~ 2.1.8 EXTENT OF RESPONSIBILITY <br />The Construction Manager does not warrant or guarantee estimates and schedules except as may be included as part <br />of the Gnaranteed Maximum Price. The recommendations and advice of the Construction Manager concerning <br />design alternatives shall be subject to the review and approval of the Owner and the Owner's professional <br />consultants. It is not the Construction Manager's responsibility to ascertain that the Drawings and Specifications are <br />in accordance with applicable laws, statutes, ordinances, building codes, rules and regulations. However, if the <br />Construction Manager recognizes that portions of the Drawings and Specifications are at variance therewith, the <br />Construction Manager shall promptly notify the Architect and Owner in writing. <br /> <br />~ 2.1.9 EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION <br />The Construction Manager shall comply with applicable laws, regulations and special requirements of the Contract <br />Documents regarding equal employment opportunity and affirmative action programs. <br /> <br />~ 2.2 GUARANTEED MAXIMUM PRICE PROPOSAL AND CONTRACT TIME <br />9 2.2.1 When the Drawings and Specifications are sufficiently complete, and comnetitive hids are sllhmitted, the <br />Construction Manager shall propose a Guaranteed Maximum Price, which shall be the sum of the estimated Cost of <br />the Work and the Construction Manager's Fee, <br /> <br />~ 2.2.2 As the Drawings and Specifications may not be fnlished at the time the Guaranteed Maximum Price proposal <br />is prepared, the Construction Manager shall provide in the Guaranteed Maximum Price for further development of <br />the Drawings and Specifications by the Architect that is consistent with the Contract Documents and reasonably <br />inferable therefrom. Such further development does not include such things as changes in scope, systems, kinds and <br />quality of materials, finishes or equipment, all of which, if required, shall be incorporated by Change Order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.