Laserfiche WebLink
<br /> SCHEDULE 3.0 STORM SEWER <br />. OplIi::('riptinn lInit Pot Q1y Unit Pri('Jl'. Fyfp.n~inn <br /> 1. 12" RCP Class 5 LF , 438.00 20.00 8,760.00 <br /> 2. 15" RCP Class 5 LF 204.50 21.30 4,355.85 <br /> 3. 27" RCP Class 3 LF 180.00 31.82 5,727.60 <br /> 4. 30" RCP Class 3 LF 1,260.00 38.35 48,321.00 <br /> 5. 36" RCP Class 3 LF 48.50 56.66 2,748.01 <br /> 6. 42" RCP Class 3 LF 106.00 62.58 6,633.48 <br /> 7. 48" RCP Class 3 LF 407.00 75.21 30,610.47 <br /> 8. 42" F.E.S. Class 3 EA 1.00 1,450.00 1,450.00 <br /> 9. 48" RCP F.E.S. Class 3 EA 2.00 1,600.00 3,200.00 <br /> 10. Catch basin 2' x 3' EA 4.00 900.00 3,600.00 <br /> 11. 48" Manhole EA '4.00 1,187.50 4,750.00 <br /> 12. 60" Manhole EA 13.00 2,060.00 26,780.00 <br /> 13. 72" Manhole EA 1.00 4,615.00 4,615.00 <br /> 14. In-place Density Test EA 35.00 30.00 1,050.00 <br /> 15. Standard Proctor EA 1.00 80.00 80.00 <br /> SCHEDULE 4 STORM SEWER TOTAL $152,681.41 <br /> ESTIMATED TOTAL CHANGE ORDER NO.2 TOTAL $241,670.49 <br /> Tax and Bond included. <br />. Manhole, catch basin, and gate valve adjustments NOT included. <br />Ph" rock pipe bedding if needed - $9.00 ton. <br /> <br />. <br /> <br />CO'2-230.215 <br />