Laserfiche WebLink
<br /> ELK PARK CENTER <br />. ARCON CONSTRUCTION, INC. <br /> CHANGE ORDER NO.2 <br /> DESCRIPTION: This change order consists of the sanitary sewer, water, and SlOrm sewer <br /> improvements in the Hillside Crossing plat. <br /> PURPOSE OF THE <br /> CHANGE ORDER: The purpose is 10 add the underground utilities in the Hillside Crossing plat 10 the <br /> current project which brings these utilities 10 the site. <br /> The estimated quantities and unit costs for this work are as follows: <br /> SCHEDULE 1.0 SANITARY SEWER <br /> np<;:l'"nprinn lInit F<t Qty TTnit Prit'P.: Fyfpn~inn <br /> 1. Connect 10 existing sanitary sewer EA 1.00 437.50 437.50 <br /> 2. 8" PVC 10-12' deep LF 960.00 15.63 15,004.80 <br /> 3. 8" PVC 12-14' deep LF 13.00 24.01 312.13 <br /> 4. 8" PVC 14-16' deep LF 10.00 30.77 307.70 <br /> 5. 6" PVC 10-12' deep LF 140.00 17.95 2,513.00 <br /> 6. Standard manhole EA 5.00 1,450.00 7,250.00 <br /> 7. Manhole extra depth LF 24.00 65.50 1,572.00 <br /> 8. 8" x 6" wye EA 4.00 46.75 187.00 <br />. 9. 8" PVC plug EA 1.00 38.75 38.75 <br />10. Standard ProclOr EA 1.00 80.00 80.00 <br /> 1 I. In-place Density EA 13.00 30.00 390.00 <br /> 12. 12.8 outside drop EA 1.00 1,125.00 1.125.00 <br /> SCHEDULE 1 SANITARY SEWER TOTAL 29,217.88 <br /> SCHEDULE 2.0 W ATERMAIN <br /> np:~('r;l?ri(m lInit F..t Qty Tlnit Prir:f' FytP:n~iC1n <br /> 1. Connect 10 existing 12" watermain EA 1.00 250.00 250.00 <br /> 2. Connect 10 existing 10" watermain EA 1.00 250.00 250.00 <br /> 3. 6" DIP LF 312.00 15.92 4,967.04 <br /> 4. 8" DIP LF 991.50 15.61 15,477.31 <br /> 5. 12" DIP LF 989.00 19.85 19,631.65 <br /> 6. Hydrant w/valve EA 7.00 1,500.00 10,500.00 <br /> 7. 6" Valve EA 3.00 322.50 %7.50 <br /> 8. 8" Valve EA 3.00 437.50 1,312.50 <br /> 9. Fittings LB 4,970.00 1.16 5,765.20 <br /> 10. Standard ProclOr EA 1.00 80.00 80.00 <br /> 11. In-place Density EA 19.00 30.00 570.00 <br /> SCHEDULE2 WATERMAIN TOTAL 7,297.50 59,771.20 <br />. <br /> <br />CO#2-230.215 <br />