My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 08-22-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
08/22/1994
>
5.6. SR 08-22-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:52 AM
Creation date
5/1/2007 2:51:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/22/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />proposal 'A' - Continued <br /> <br />Page 3. <br /> <br />. <br /> <br />1. Refrigeration system <br /> <br />2. Ice floor and refrigeration piping <br /> <br />3. Underslab heating system for frost depth control uti- <br />lizing waste heat from the refrigeration system. <br /> <br />4. Snowmelt pit <br /> <br />5. Ice perimeter dasherboards <br /> <br />6. Dehumidification system consultation with AlE <br /> <br />7. Consulting assistance in lighting system and sound <br />system design with AlE <br /> <br />8. Consulting assistance in arena ventilation system design <br />with AlE <br /> <br />9. Consulting assistance on total facility layout for <br />providing the necessary efficiency in management with <br />AlE and Task Force Committee <br /> <br />10. Consulting assistance on materials and finishes for <br />critical areas and for guidance on dressing room <br />accessories, etc. <br /> <br />11. Ice resurfacer and necessary accessories recommendations <br />to Task Force Committee <br /> <br />12. Miscellaneous consulting to assist in sports center <br />design <br /> <br />Phase V - Bidding and Construction Contracts <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br />. <br /> <br />Meet with local building inspectors for project approvals. <br /> <br />Contact all qualified contractors. <br /> <br />Hold pre-bid meeting in Elk River for contractors infor- <br />mation and questions. <br /> <br />Review all bids and make recommendations for contract awards. <br /> <br />Oversee preparation of contracts for construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.