Laserfiche WebLink
<br />. <br /> <br />proposal 'A' - Continued <br /> <br />Page 3. <br /> <br />. <br /> <br />1. Refrigeration system <br /> <br />2. Ice floor and refrigeration piping <br /> <br />3. Underslab heating system for frost depth control uti- <br />lizing waste heat from the refrigeration system. <br /> <br />4. Snowmelt pit <br /> <br />5. Ice perimeter dasherboards <br /> <br />6. Dehumidification system consultation with AlE <br /> <br />7. Consulting assistance in lighting system and sound <br />system design with AlE <br /> <br />8. Consulting assistance in arena ventilation system design <br />with AlE <br /> <br />9. Consulting assistance on total facility layout for <br />providing the necessary efficiency in management with <br />AlE and Task Force Committee <br /> <br />10. Consulting assistance on materials and finishes for <br />critical areas and for guidance on dressing room <br />accessories, etc. <br /> <br />11. Ice resurfacer and necessary accessories recommendations <br />to Task Force Committee <br /> <br />12. Miscellaneous consulting to assist in sports center <br />design <br /> <br />Phase V - Bidding and Construction Contracts <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br />. <br /> <br />Meet with local building inspectors for project approvals. <br /> <br />Contact all qualified contractors. <br /> <br />Hold pre-bid meeting in Elk River for contractors infor- <br />mation and questions. <br /> <br />Review all bids and make recommendations for contract awards. <br /> <br />Oversee preparation of contracts for construction. <br />