Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />proposal 'A' - continued <br /> <br />Page 2. <br /> <br />phase II - Schematic Desiqn <br /> <br />A. Coordinate between Task Force and A/E on the preparation of <br />preliminary plan layouts and facility concept. <br /> <br />B. Coordinate with A/E on preliminary Opinions of probable <br />Costs <br /> <br />C. Coordinate obtaining necessary soil borings. (Billed <br />directly to City.) <br /> <br />Phase III - Desiqn Development <br /> <br />A. <br /> <br />Coordinate between Task Force and A/E on development plans, <br />preliminary specifications, materials selections, etc. <br /> <br />B. <br /> <br />Refrigeration System and Rink Floor <br /> <br />1. pre-design (Design Development phase) meeting with <br />Architects/Engineers and, the Task Force Representatives. <br /> <br />2. Assistance in the ice rink and related facility layouts <br />during design development. <br /> <br />3. Review of soil borings and subsoil analysis related to <br />ice sheet. <br /> <br />C. Coordinate with A/E on Opinions of probable Costs. <br /> <br />D. Conduct preliminary value engineering study on the design <br />development. <br /> <br />Phase IV - Construction Documents <br /> <br />A. Coordinate between Task Force and A/E for review of final <br />design and development of detailed bid documents including <br />plans and specifications. <br /> <br />B. Conduct periodic meetings with A/E to coordinate final plan <br />and specification development. <br /> <br />C. Ice related design including plans and specifications. <br />