My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 08-22-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
08/22/1994
>
5.6. SR 08-22-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:52 AM
Creation date
5/1/2007 2:51:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/22/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />proposal 'A' - continued <br /> <br />Page 2. <br /> <br />phase II - Schematic Desiqn <br /> <br />A. Coordinate between Task Force and A/E on the preparation of <br />preliminary plan layouts and facility concept. <br /> <br />B. Coordinate with A/E on preliminary Opinions of probable <br />Costs <br /> <br />C. Coordinate obtaining necessary soil borings. (Billed <br />directly to City.) <br /> <br />Phase III - Desiqn Development <br /> <br />A. <br /> <br />Coordinate between Task Force and A/E on development plans, <br />preliminary specifications, materials selections, etc. <br /> <br />B. <br /> <br />Refrigeration System and Rink Floor <br /> <br />1. pre-design (Design Development phase) meeting with <br />Architects/Engineers and, the Task Force Representatives. <br /> <br />2. Assistance in the ice rink and related facility layouts <br />during design development. <br /> <br />3. Review of soil borings and subsoil analysis related to <br />ice sheet. <br /> <br />C. Coordinate with A/E on Opinions of probable Costs. <br /> <br />D. Conduct preliminary value engineering study on the design <br />development. <br /> <br />Phase IV - Construction Documents <br /> <br />A. Coordinate between Task Force and A/E for review of final <br />design and development of detailed bid documents including <br />plans and specifications. <br /> <br />B. Conduct periodic meetings with A/E to coordinate final plan <br />and specification development. <br /> <br />C. Ice related design including plans and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.