Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />II <br />. <br />. <br />II <br />. <br />. <br />II <br />. <br />. <br />. <br />. <br />III <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />II <br />. <br />. <br />. <br /> <br /> <br /> <br /> <br />r--' <br /> <br />f'ProjetrExperience/pesig n Examples <br /> <br /> <br />YMCA of Metropolitan Minneapolis: <br />Emma B. Howe Northtown YMCA Original Facility, <br />Expansion/Renovation · Coon Rapids, MN <br /> <br />Completion date: 1996 (original); 2005 (expansion) <br />. Total square footage: 65,000 sJ. (original); 9,500 sJ. (expansion) <br />. Total overall costs: $6.3 million (original); $1 million (expansion) <br />Construction time frame: November 1994 - May 1996 (original); <br />September 2004 - September 2005 (expansion) <br />Project designer: BWBR Architects <br />. Project manager: Greg Fenton <br />Principal in charge: Steve Patrick <br /> <br />New-construction family branch YMCA includes a two-court gymnasium; <br />fitness area; jogging track; aerobics studio and fitness equipment; natatorium <br />with six-lane lap pool, shallow-water leisure pools with zero-depth entry and <br />waterslide, whirlpool, and sauna; community meeting rooms; youth, adult, <br />and family locker rooms; youth gym; facilities for child care; teen center. <br /> <br />. In 2005, BWBR designed a two-story expansion that greatly increased <br />aerobic/fitness studio space and parking capacity. <br /> <br />Exterior design of expansion blends with and complements original facility's <br />design and materials. <br /> <br />Teamed with construction manager Kraus-Anderson to deliver the <br />project on time and within budget. <br /> <br />Proposal for Architectural and Engineering Services ~ Elk River YMCA ~ January 200719 <br /> <br />~ <br />BWBR <br />~IT;; <br />