Laserfiche WebLink
<br /> <br /> <br />/" <br /> <br />/1 110 <br />i. \1= <br />! G) i I <br />I\:': ,E:::::::I <br />r---r---~; L.._._n__._ <br />j i :L .-=~.~.._.__..__._ <br /> <br />/" <br /> <br />o <br />o <br /> <br /> <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />~ <br /> <br />YMCA of Metropolitan Minneapolis: <br />Elk River YMCA Master Planning/Site Study · Elk River, MN <br /> <br />Completion date: 2006 <br />Total square footage: 50,000 sJ. (prelim. est.) <br />Total overall costs: $12 million (prelim. est.) <br />Project designer: BWBR Architects <br />Project manager: Greg Fenton <br />Principal in charge: Steve Patrick <br />Designer: Craig Peterson <br /> <br />The preliminary vision includes fitness facilities with gymnasium, kid's zone <br />program space, locker rooms, fitness studios, duo-pool aquatics space, and <br />outdoor splash zone. <br /> <br />Project is conceived as a partnership between the YMCA of Metropolitan <br />Minneapolis and the City of Elk River. <br /> <br />· BWBR coordinated this conceptual study with the YMCA, exploring site <br />and floor planning opportunities and exterior conceptual imagery. <br />Public literature and general marketing efforts were used as a means to <br />develop project understanding and support. <br /> <br />8 i Proposal for Architectural and Engineering Services i Elk River YMCA 1 January 2007 <br />