Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />. <br />. <br />. <br />. <br />. <br />(I <br />. <br />. <br />II <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.. <br />LI <br />. <br />. <br />. <br /> <br />YMCA of Metropolitan Minneapolis: <br />Minnesota Valley Family YMCA · Burnsville, MN <br /> <br />· Completion date: 1998 <br />Total square footage: 61,000 sJ. <br />. Total overall costs: $6.2 million <br />Construction time frame: March 1997 - January 1998 <br />Project designer: BWBR Architects <br />· Project manager: Greg Fenton <br />Principal in charge: Steve Patrick <br /> <br />New construction of a family branch YMCA includes gymnasium; fitness area; <br />lap pool; shallow-water recreational pool with zero-depth entry, whirlpool, and <br />sauna; and community meeting rooms. <br /> <br />. <br /> <br />As part of the Fairview Ridges Campus - a development that includes a <br />hospital, medical clinic, sports medicine clinic, church, and senior housing <br />_ the "Y" contributes to a holistic approach to health care and wellness. <br /> <br />The use of precast concrete walls helped keep the project economical and speed <br />up construction. The earth-toned building materials vary in color tone and <br />size, creating texture that breaks down the building's scale to complement the <br />residential environment nearby. <br /> <br />The floor plan and layout were designed to maximize the space allocated for <br />facility programs and minimize space devoted to circulation. <br /> <br />101 Proposal for Architectural and Engineering Services! Elk River YMCA! January 2007 <br />