Laserfiche WebLink
<br />this general location needs to be relocated or the symbol should be for an existing <br />hydrant. This issue should be clarified. <br /> <br />3. There are two connections shown from the existing trunk sanitary sewer line located on <br />the south side of the site. The most easterly is a deep line intended to collect discharge <br />from the cooler drain. The westerly connection branches off into three stubs into the <br />building. This is due to the architectural layout of the internal workings of the building <br />and may actually be reduced in the final building design. The westerly three connections <br />come into a new manhole, which can be utilized as a sampling manhole. The easterly <br />connection needs to have a sampling manhole prior to connection to the existing trunk <br />line. According to City policy, sanitary sewer services cannot connect to existing <br />manholes. Therefore, the two connections need to be cut into the existing trunk sanitary <br />sewer line by means of a "Y" connection. <br /> <br />4. The driveway connection to Waco Street is relatively close to the driveway connection to <br />the Target site to the south. It would make for better traffic flow if this driveway were <br />moved to the north to align with 18yd Avenue. <br /> <br />If the need for the driveway location on Waco Street is for truck traffic servicing the data <br />center, perhaps truck traffic could utilize the Target data center access off of Waco Street <br />and be continued from that location into the UnitedHealth Group site. <br /> <br />The connection to Business Center Drive is approximately 150 feet east of the easterly <br />driveway to the clinic located on the north side of Business Center Drive. There is, <br />however, an undeveloped commercial lot east of the clinic site which will likely have <br />additional driveways which can be made to line up with the proposed driveway to the <br />UnitedHealth Group site. It would be impossible to get the UnitedHealth Group's <br />driveway onto Business Center Drive to line up with the existing driveways on the north <br />side, due to the size of the proposed pond. <br /> <br />5. Due to size of the site, a NPDES permit will be required. Along with that permit, a <br />Storm Water Pollution Prevention Plan (SWPPP) needs to be submitted. There is one <br />included in the plan set on Sheet C.5. City policy however is that the SWPPP must be <br />submitted on 8 ~" x 11" paper and signed by the owner, engineer and contractor. Also, <br />proof of the application for the NPDES permit must be submitted. <br /> <br />6. According to City policy, record drawings of the site improvements including sanitary <br />sewer, water and storm sewer facilities must be submitted at the end of construction in <br />both an electronic and paper format. Specific information regarding the format of the <br />submittal can be provided at the appropriate time. <br /> <br />If you have any questions regarding any of these comments, please contact me. <br /> <br />S:\PLANNING\Case Files\2007\CUP\CU 07-04 United Health\Ol 02 07 Engr's memo.doc <br />