Laserfiche WebLink
<br />If payment is not received, the developer will be required to construct the right turn lane when <br />the proposed 187th Avenue> access is constructed. The developer will also be required to <br />account for drainage; if a culvert is necessary, it must be RCP with a minimum 18" diameter <br />and be installed with 1:6 safety aprons and grates. The access must have 40' radii and an <br />access permit and signage fees are required with either scenario. Pavement marking and <br />correction to incorporate the right turn lane will be necessary. The limited access symbol must <br />be applied to the final drawing along the County Highway. <br /> <br />If you have any questions or comments call me at 763-241-7013. <br /> <br />Respectfully, <br /> <br />Richard D. Corbin <br />Sherburne County Public Works <br /> <br />Cc: Chris Leeseberg, City Planner <br />Terry Maurer, City Engineer <br />John Menter, Public Works Director <br />Rhonda Lewis, County Engineer. <br />Edward Dulak, Developer <br />