<br />e <br /> <br />e <br /> <br />e <br /> <br />CHANGE ORDER NO.1 <br />DEERFIELD 3RD ADDITION STORMW ATER SYSTEM IMPROVEMENTS <br /> <br />February 23, 1994 <br /> <br />Change Order No.1 extends the outlet pipe from north of the Hartman property driveway <br />in Royal Oaks Ridge (Lot 11), through lot 12 and into an existing wetland. The new design <br />involves additional 36" RCP, an extra manhole, driveway removal and restoration, a conduit <br />through the driveway embankment for a sprinkler system, and rip-rap. <br /> <br />The original design terminated the outlet pipe north of the driveway, with a 42" RCP <br />through the driveway embankment. In exchange for the drainage easement through the Hartman <br />property, the Owner requested a buried pipe rather than a swale-type arrangement. <br /> <br />All prices are either unit prices from the original bid or new prices for additional items not <br />in the original bid. Two items, the 36" RCP and 2" Bituminous Driveway, were requested by the <br />Contractor to be modified from the original bid unit price. The cost change is shown below. <br /> <br />36" RCP <br />2" Bituminous Driveway <br /> <br />From $53.00 to $54.00 per linear foot <br />From $8.00 to $12.00 per square yard <br /> <br />A permit, dated February 15, 1994, was received from the U.S. Army Corps of Engineers <br />for the work required under the Change Order in the fringe wetland area around the existing <br />pond/wetland. <br /> <br />It is understood that the homeowner, Mr. Hartman, will contract independently for the <br />restoration of the area disturbed by the construction. The contractor is obligated to salvage any <br />topsoil and respread it after construction. <br /> <br />Costs associated with this Change Order are shown on the attached Change Order cost <br />breakdown. <br />