Laserfiche WebLink
<br />. <br /> <br />CHANGE ORDER FOR: <br />DEERFIELD 3RD ADDITION STORMWATER SYSTEM IMPROVEMENTS <br />ELK RIVER, MN (230-195-20) <br /> <br /> <br />ITEMS ADDED <br /> <br />SCHEDULE 3.0 - STORM DRAINAGE <br /> <br />1 36" RCP CLASS III <br />2 72" DIA. MANHOLE (0'-8' DEPTH) <br />3 72" DIA. MANHOLE (EX. DEPTH) <br />4 REMOVE BITUMINOUS DRIVEWAY <br />5 2" BITUMINOUS DRIVEWAY <br />6 RIP-RAP <br /> <br />LF <br />EA <br />LF <br />SY <br />SY <br />TON <br /> <br />317 <br />1 <br />3 <br />250 <br />250 <br />16 <br /> <br />54.00 <br />2,800.00 <br />175.00 <br />2.00 <br />12.00 <br />19.00 <br /> <br />17,118.00 <br />2,800.00 <br />525.00 <br />500.00 <br />3,000.00 <br />304.00 <br /> <br />ADDED ITEMS TOTAL <br /> <br />$24,247.00 <br /> <br />ITEMS DELETED <br /> <br />e SCHEDULE 3.0 - STORM DRAINAGE <br /> <br />1 42" RCP END SECTION <br />2 42" RCP <br />3 * JOINT TIES <br />4 SCOUR BASIN <br /> <br />EA <br />LF <br />EA <br />LS <br /> <br />2 <br />44 <br />38 <br />1 <br /> <br />1,500.00 <br />85.00 <br />15.00 <br />300.00 <br /> <br />3,000.00 <br />3,740.00 <br />570.00 <br />300.00 <br /> <br />DELETED ITEMS TOTAL <br /> <br />$7,610.00 <br /> <br />* - JOINTS REMAIN TIED ON 30" RCP @ 11.3 % FROM ST A. 1 + 20 TO ST MH 1 ONLY <br /> <br />TOTAL BASE BID <br />CHANGE ORDER ADJUSTMENT <br /> <br />$122,307.00 <br />$16,637.00 <br /> <br />REVISED CONSTRUCTION COST <br /> <br />$138,944.00 <br /> <br />e <br />