Laserfiche WebLink
<br />CHANGE ORDER <br /> <br />(Instructions on reverse side) <br /> <br />No. <br /> <br />1 <br /> <br />PROJECT: <br /> <br />Deerfield 3rd Addition <br />Stormwater System Improvements <br /> <br />DATE OF ISSUANCE: February 23, 1994 <br /> <br />OWNER: City of Elk River <br />(Name, 13065 Orono Parkway <br />Address) Elk River, MN 55330 <br />CONTRACTOR: <br /> <br />OWNER's Project No. <br /> <br />230-195-20 <br /> <br />W.B. Miller, Inc. <br />16765 Nutria Street <br />Ramsey, MN 55303 <br /> <br />ENGINEER: Maier Stewart & Associates, Inc. <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br /> <br />CONTRACT FOR: <br /> <br />Deerfield 3rd Addition <br />Stormwater System Improvements <br /> <br />ENGINEER's Project No. <br /> <br />230-195-20 <br /> <br />You are directed to make the following changes in the Contract Documents. <br /> <br />Description: <br /> <br />Extension of 36" RCP beneath driveway to existing pond. <br /> <br />Purpose of Change Order: <br /> <br />Eliminate ditch as per property owners request in exchange of easement. <br /> <br />Attachments: (List documents supporting change) <br /> <br />Revised plan sheet, change order bid schedule, and narrative. <br /> <br />CHANGE IN CONTRACT PRICE: <br /> <br />CHANGE IN CONTRACT TIME: <br /> <br />Original Contract Price <br /> <br />Original Contract Time <br /> <br />$ <br /> <br />122,307.00 <br /> <br />45 days <br /> <br />days or date <br /> <br />Previous Change Orders No. -- to No. -- <br /> <br />Net change from previous Change Orders <br /> <br />$ <br /> <br />None <br /> <br />- 0 - <br /> <br />days <br /> <br />Contract Price prior to this Change Order <br /> <br />Contract Time Prior to this Change Order <br /> <br />$ <br /> <br />122,307.00 <br /> <br />45 days <br /> <br />da s or date <br /> <br />Net Increase (DoorEJaGo) of this Change Order <br /> <br />Net Increase (Decrease) of this Change Order <br /> <br />$ <br /> <br />16,637.00 <br /> <br />none <br /> <br />days <br /> <br />Contract Price with all approved Change Orders <br /> <br />Contract Time with all approved Change Orders <br /> <br />$ <br /> <br />138,944.00 <br /> <br />45 days <br /> <br />City of Elk River, MN <br /> <br /> <br />days or date <br /> <br />RECOMMENDED: <br />------= <br />By ~11~U/~ <br />MSA Cons ng Engineers <br /> <br />APPROVED: <br /> <br />by <br /> <br />by <br /> <br />EJCDC No. 1910-8-B (1983 <br />Edition) <br /> <br />e <br /> <br />230195c:o.#1 <br />