My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4. SR 08-23-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
08/23/1993
>
8.4. SR 08-23-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:18 AM
Creation date
6/28/2006 3:05:22 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />City of Elk River <br />August 9, 1993 <br />Page Three <br /> <br />9. SCHOOL STREET/JACKSON AVENUE INTERSECTION IMPROVEMENIS <br /> <br />The plans and specifications for the School Street/Jackson Avenue Intersection and Signalization <br />Project have been submitted to Mnnar. We are in the process of making minor revisions <br />requested by MnDar. We will be prepared to recommend advertising for bids after the school <br />board has had the opportunity to review the proposed project and indicate whether or not they <br />are willing to provide the easements necessary to construction these improvements. <br /> <br />10. T.R. 10 TRUNK SEWER AND LIFT STATION <br /> <br />Plans and specifications for the new lift station and trunk sewer from the intersection of T.H. 10 <br />and Main Street down to the wastewater treatment plant have been completed and we are <br />prepared to recommend the City Council advertise for bids on this project. It will be opened in <br />early September and construction will be initiated and completed yet this fall. <br /> <br />11. 500,000 GALLON WATER roWER <br /> <br />We are in the process of reviewing shop drawings for the proposed 500,000 gallon elevated <br />tower to be constructed in the northeast portion of the city. It is anticipated that within the next <br />thirty (30) days activity will begin on the site and as earlier discussed, the tower should be <br />erected in 1993. However, it will not be painted or put in service until approximately July 1, <br />1994. <br /> <br />12. WELL AND WATER TREATMENT PLANT - NORTHEAST AREA <br /> <br />The specifications for the well associated with the new tower are nearing completion and should <br />be presented to the utility commission at their September meeting. We would anticipate bidding <br />the project at that point and constructing the well yet this fall. Based on the water samples <br />provided by the new well design of the water treatment facility would proceed through the winter <br />months and bidding will take place in early 1994 allowing construction and completion of that <br />project during the 1994 construction season. <br /> <br />13. WATER TREATMENT PLANT - GARY STREET <br /> <br />The contracts have been signed for the water treatment plant on Gary Street and a <br />preconstruction meeting will be scheduled within the next two (2) weeks. Construction is <br />anticipated to begin shortly after that. The construction schedule is for the building to be erected <br />this fall and internal improvements made during the winter months with the facility being placed <br />on line in early 1994. <br />
The URL can be used to link to this page
Your browser does not support the video tag.