Laserfiche WebLink
<br />§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the <br />Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of <br />commencement of the Work. <br />§ A.2.3 Substantial Completion <br />§ A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall <br />achieve Substantial Completion of the entire Work: <br />(Check one of the following boxes and complete the necessary information.) <br />\[ \] Not later than ( ) calendar days from the date of commencement of the Work. <br />\[ \] By the following date: <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be <br />completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion <br />of such portions by the following dates: <br />Portion of WorkSubstantial Completion Date <br /> <br />§ A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated <br />damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents <br />and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />DocumentTitleDatePages <br /> <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment.) <br /> <br />SectionTitleDatePages <br /> <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br /> <br />NumberTitleDate <br /> <br />§ A.3.1.4 The Sustainability Plan, if any: <br /> (If the Owner identified a Sustainable Objective in the Owner’s Criteria, identify the document or documents that comprise <br />the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan <br />identifies and describes the Sustainable Objective; the targeted Sustainable Measures; implementation strategies selected to <br /> achieve the Sustainable Measures; the Owner’s and Construction Manager’s roles and responsibilities associated with <br />achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement of each <br /> AIA Document A133 – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br /> Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:38:42 CDT <br />3 <br />on 10/16/2025 under Subscription No.20250122412 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeff442e4498d0968af) <br />