Laserfiche WebLink
<br />Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C <br />to the Agreement.) <br />TitleDatePages <br /> <br />Other identifying information: <br />§ A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: <br />(Identify each allowance.) <br />ItemPrice <br /> <br />§ A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: <br />(Identify each assumption and clarification.) <br />§ A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: <br />(List any other documents or information here, or refer to an exhibit attached to this Amendment.) <br /> ARTICLE A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS <br />§ A.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, identified <br />below: <br />(List name, discipline, address, and other information.) <br />This Amendment to the Agreement entered into as of the day and year first written above. <br /> <br />OWNER (Signature)CONSTRUCTION MANAGER (Signature) <br /> <br />(Printed name and title)(Printed name and title) <br /> AIA Document A133 – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br /> Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:38:42 CDT <br />4 <br />on 10/16/2025 under Subscription No.20250122412 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeff442e4498d0968af) <br />