Laserfiche WebLink
<br />Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The <br /> Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work, as that term is defined in Article 6 of the <br />Agreement. <br />§ A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed ($ ), subject to additions <br />and deductions by Change Order as provided in the Contract Documents. <br />§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed <br /> Maximum Price organized by trade categories, including allowances; the Construction Manager’s contingency; alternates; the <br /> Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the <br />Agreement. <br />(Provide itemized statement below or reference an attachment.) <br />§ A.1.1.3 The Construction Manager’s Fee is set forth in Section 6.1.2 of the Agreement. <br />§ A.1.1.4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section 6.1.3 of <br />the Agreement. <br />§ A.1.1.5 Alternates <br />§ A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: <br />ItemPrice <br /> <br />§ A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution <br />of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. <br />(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) <br />ItemPriceConditions for Acceptance <br /> <br />§ A.1.1.6 Unit prices, if any: <br />(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) <br />ItemUnits and LimitationsPrice per Unit ($0.00) <br /> <br />ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />§ A.2.1 The date of commencement of the Work shall be: <br />(Check one of the following boxes.) <br />\[ \] The date of execution of this Amendment. <br />\[ \] Established as follows: <br />(Insert a date or a means to determine the date of commencement of the Work.) <br />If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this <br />Amendment. <br /> AIA Document A133 – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br /> Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:38:42 CDT <br />2 <br />on 10/16/2025 under Subscription No.20250122412 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeff442e4498d0968af) <br />