Laserfiche WebLink
Mr. Justing Femrite, P.E. <br />December 3, 2024 <br />Page: 2 <br />• Wetland Delineation: No wetlands are anticipated within the project area. <br />• Easements & ROW: We anticipate only temporary construction easements will be needed <br />for the gravity sewer option. We will create the temporary easement exhibits for these. We <br />did not include any easement work for the HOA parcel or any of the HOA sewer system that <br />will be turned over to the City. If these require easements we can create those as an <br />additional service. <br />• Feasibility Report: We will provide a memo evaluating the additional alternative of a lift <br />station and forcemain. This will be an addition to the existing feasibility report. <br />• Design Services: Includes sanitary sewer design and plan production. This will include <br />preparation of plans and specifications in the standard City formats. <br />• Soil Borings and Environmental: No geotechnical evaluations are included in this proposal. <br />These will be needed if directional drilled forcemain is proposed. We can solicit a <br />geotechnical contractor for bids at the City's request. <br />• Project Specifications: This document will be prepared in accordance with City standards <br />utilizing Bolton & Menk, Inc standard formatting. <br />• Project Permitting and Utility Coordination: We will complete a sewer extension permit and <br />an NPDES erosion control permit. The County ROW permit will need to be submitted by the <br />selected contractor. <br />• Bidding Services: We will solicit bids, answer questions, issue addenda if needed, open <br />bids and prepare a letter of recommendation. <br />• Construction Services: We will perform construction staking and provide a field <br />representative during construction. We will also complete construction management <br />tasks such as holding a preconstruction meeting, submittal reviews, weekly construction <br />meetings as needed, pay request processing, contract processing, and final close out. <br />• Construction Testing: This proposal does not include construction testing. We can <br />solicit at testing contractor for bids at the City's request. <br />In addition to the above items, meetings will occur at logical periods throughout the design process. We <br />will prepare all exhibits and graphics for those meetings. Our Project Manager will attend all design - <br />related meetings. Should any of the above -listed items that are not included in this proposal be <br />requested, we will provide separate fee proposals as needed. <br />Project Team <br />Jason Cook, P.E. is the proposed Project Manager and lead Engineer, performing the design work tasks <br />for the project. Andy Hill, L.S. will complete the platting process, Jon Nico, E.I.T. will be the lead CAD <br />drafter and designer. <br />H:\ELKR\$_City of Elk River MN\Meadowwoods Village Sewer Extension Proposal.docx <br />Bolton & Menk is an equal opportunity employer. <br />