My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 04-15-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
04-15-2024
>
4.10 SR 04-15-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:01:24 PM
Creation date
11/15/2024 1:01:24 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. disconnect and remove existing polymer feed system, confirm <br />polymer feed system sizing and install new chemical feed tubing <br />and/or system necessary accommodate the New Centrifuge System; <br />8. install the New Centrifuge System and connect feed piping, drain <br />piping, plumbing, chemical feed, diverter gate (or similar system) and <br />electrical thereto; <br />9. install new concrete supports for the New Centrifuge System as <br />required; <br />10. provide start-up services and support for the New Centrifuge System <br />and associated equipment and controls; <br />II.revise sludge feed piping from existing sludge transfer pumps as <br />necessary to feed New Centrifuge System; <br />12. install new electrical and control systems for the New Centrifuge <br />System that are of a quality and performance level at or above the <br />existing Screw Press System; <br />13. provide all necessary controls integration; <br />14. provide temporary biosolids dewatering during the Work whereby <br />the dewatered biosolids are deposited in the existing dumpsters; <br />15.install any and all additional project components, as necessary, to <br />form a fully complete and operational system; <br />16. deliver operations and maintenance manuals to Owner; <br />17. require copies of all notices to be simultaneously delivered to Owner; <br />18. deliver all warranties (include those from Contractor and those <br />provided by manufacturers) to Owner; <br />19. provide all necessary training and commissioning services; <br />20. conduct all necessary contract and project oversight and inspections; <br />and <br />21. provide all necessary regulatory coordination and approvals for the <br />Work. <br />1.4 ORDER OF THE WORK <br />A. The Work shall be performed pursuant to an Owner -approved schedule, <br />which approval Owner shall not unreasonably withhold. All Work must <br />be completed within sixty (60) days after the commencement date <br />identified in the Owner -approved schedule. <br />3 <br />Page 118 of 201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.