My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 04-15-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
04-15-2024
>
4.10 SR 04-15-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:01:24 PM
Creation date
11/15/2024 1:01:24 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. include provisions by which Contractor acknowledges that Design - <br />Builder is not Owner's agent, and that Contractor is not entitled to <br />receive any compensation from Owner for the Work; <br />S. state that change orders, construction change directives, and similar <br />contract modifications that would result in a cost to Owner or a <br />reduction in quality or scope of the Work are not permitted, unless <br />approved in writing by Owner; <br />6. permit Owner, and those identified by Owner, to attend all inspections <br />of the Work; and <br />7. state that payment for all Work performed by Contractor shall be <br />made pursuant to a confidential exhibit with Contractor and Design - <br />Builder, in the Mediated Settlement Agreement from funds held in the <br />John Harens Trust Account. <br />1.2 PROJECT LOCATION <br />A. The Repair Project is located in the City of Elk River, Minnesota, which is <br />located in Sherburne County. <br />1.3 PROJECT DESCRIPTION <br />A. The Work includes the complete permitting, construction, and start-up <br />necessary for the Repair Project, as including, without limitation: <br />1. remove the Existing Screw Presses and disconnect all piping, <br />plumbing and electrical associated therewith; <br />2. demolish existing concrete supports for the Existing Screw Press to <br />allow for install of the New Centrifuge System, and repair floor areas <br />that are damaged during demolition; <br />3. remove and dispose of the Existing Screw Presses by a manner, and to <br />a location, identified by Design -Builder; <br />4. remove and dispose of the Existing Reaction Mix Tanks and all related <br />piping, chemical feed piping, electrical and concrete platforms; <br />S. remove and dispose of all walkways and platforms around Existing <br />Screw Presses; <br />6. disassemble the conveyor servicing the Existing Screw Presses, and <br />reassemble the conveyor to and for use by the New Centrifuge System <br />if compatible. If existing conveyor is not compatible with the New <br />Centrifuge System, new conveyor to be supplied and installed; <br />2 <br />Page 117 of 201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.