My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 04-15-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
04-15-2024
>
4.10 SR 04-15-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:01:24 PM
Creation date
11/15/2024 1:01:24 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 SEQUENCE OF CONSTRUCTION <br />A. The Work shall be carried on at such places on the Repair Project and in <br />such order or precedence as may be found necessary by Design -Builder <br />to expedite the completion of the Repair Project. All Work shall be <br />performed so as to minimize any impact on existing treatment <br />processes, and at no time shall any Work interfere with any portion of <br />the treatment process, except as necessary to complete the Repair <br />Project in a timely manner. <br />1.6 USE OF PROJECT SITE <br />A. Use of the Facility shall be limited to construction operations, including <br />on -site storage of materials, on -site fabrication facilities, and field <br />offices. <br />1.7 OWNER USE OF THE PROJECT SITE <br />A. Owner may utilize all or part of the Work site and facilities at all times <br />when Work is being performed. Owner, however, shall take all <br />reasonable steps to minimize any impact on or interference with the <br />Work. <br />1.8 APPLICATIONS FOR PAYMENTS <br />A. By the 15th day of each month, Design -Builder shall submit to the <br />Owner, a progress payment application based on the percentage of <br />Work Design -Builder completed during the previous month. The <br />amount requested under each progress payment application shall be <br />calculated by determining the percentage of the Work completed as of <br />the date of the progress payment application. <br />B. Each Design -Builder progress payment application shall be <br />accompanied by supporting documentation. <br />C. Design -Builder's progress payment applications shall include a Design - <br />Builder's affidavit listing all subcontractors, suppliers, and vendors <br />having contracts with Design -Builder to provide said labor, equipment, <br />material, and services on the Project. <br />D. Design -Builder's final payment application shall include lien waivers <br />executed by each subcontractor, supplier, and vendor listed on the <br />Design -Builder's affidavit for all labor, materials, and equipment <br />supplied through the date of the pay application. <br />E <br />Page 119 of 201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.