My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Dashboard: Supplier should have a daily dash board that provides updates each day consisting of thefollowing: a) X <br />existing meter locations installed project to date b) meters installed current day, c) rolling schedule of future installs <br />4 planned to be installed over the next 30 days. If the Supplier prior customers have found additional data to be viewed via Yes <br />the dashboard to be valuable, please suggest additional information to be presented. <br />Master Service Agreement: Vendors should include their standard Master Services Agreement that would include <br />6 warranties, insurance requirements, statement of work attachments and other standard contractual language they are <br />proposing in this potential agreement. <br />Quality Processes: Upon request, the Supplier should provide its quality process for endpoint deployment services. X <br />Please attach these process descriptions within your proposal. This primarily involves capturing the last legacy read <br />7 correctly, serial numbers, form factors, water meter size, dates, etc. for the exchanged legacy to AMI Endpoints. Yes <br />Please see detail response in RFP Bid <br />Warranty. Supplier shall warrant its work for 12 months following completion of installation and acceptance of all work. X <br />8 Supplier is requested to acknowledge its compliance with this requirement. Yes <br />Please see detail response in RFP Bid <br />Pricing References and or Commerms: Electric meter Quantities <br />All references to pricing or costs must only be defined in Attachment II Pricing. Any comments or footnotes to pricing In X <br />this Attachment I, will be ignored. The quantity of electric meters by form factor for the Supplier to install is as follows: <br />3 Meter Type Qum6ry <br />3.I F09m$3 11 89 <br />3.2 rom 2SE 46 <br />9 3.3 <br />Fam 3.4 !IS -163Iaudlcd by ERMS: <br />[ostltll for New Electric Meters/Modules for 12,270 <br />InstaUsiddon Supplier to Install <br />All references to pricing or costs must only be defined in Attachment II Pricing. Any comments or footnotes to pricing In <br />this Attachment I, will be ignored. The quantity of water meters/modules and module onlyfm the Supplier to install is as <br />10 follows: <br />Quantities of water meters and modules in scope X <br />6 FaMly Meter Mrter Star Q".taY <br />10 <br />NEW Water Meters, <br />5 <br />Encoders & Registers mad <br />Quantity <br />AMI JVHUs <br />5.1 <br />Short iPerl 3/4" <br />4,5,6 <br />5.2 <br />iPerl <br />1" <br />338 <br />5.3 <br />Cordooel <br />1 1/2" <br />93 <br />5.4 <br />Cordood <br />2" <br />- <br />5.5 <br />Cordooel <br />3" <br />23 <br />5.6 <br />Cordonel <br />4" <br />9 <br />Cordovel <br />6" <br />1 1 <br />5.7 <br />5.8 <br />Cordovel <br />8" <br />- <br />Insta3 for New Meters, <br />5,010 <br />Encoders, <br />Registers and MIUs mind <br />Instau <br />TYPe <br />61 �l?.Sns 6R' Sly <br />62 aryw EBanw <br />lmbuanc <br />6.) Illavy MyRS <br />E.sar <br />6.1 Sae 1 12' 11 <br />6.1 a'*- m to <br />1 arI[rr MeeR T <br />&Sam <br />61 I lieneyFYrR- <br />Background Checks: The Supplier may be accountable to complete a general background check on all employees to <br />X <br />11 <br />out individuals with criminal backgrounds, sex offenders and other categories as proposed by the Supplier for <br />both prime and any subcontractor employees. <br />Clothing: Endpoint installation crew should wear clothing and drive vehicles that clearly indicate the installation <br />X <br />12company's <br />name. <br />13 <br />OSHATmined:lnstalters should be trained on OSHA safety practices and on the appropriate meter types (the meter type <br />X <br />selected is a TBD at this time). <br />Installer's ID's: All meter installation crews should carry proper identification, vehicles should have identifying car <br />X <br />magnets, carry I.D., and identify themselves to all Purchaser's customers before any installations are made. Car magnets <br />14 <br />to be provided by Supplier with Purchaser design approval. <br />Ethical Behavior: The Supplier will not collect any monies from Purchaser's customers and shall not accept any payment <br />X <br />15 <br />for services or energy furnished by Purchaser to its customers or any other person. <br />Safety & Environment <br />Personal Protection Equipment: The Supplier should supply and require electric meter installers to use certified tested <br />X <br />low voltage gloves, glove protectors, safety glasses, hard hat and other appropriate clothing at a minimum and should <br />supply additional Personal Protection Equipment if required by applicable laws, codes and regulations. The Supplier <br />should supply and require water meter installers to use gloves, safety glasses, temporary jumpers for installations <br />16 <br />without jumpers around the water meter at a minimum and should supply additional Personal Protective Equipment if <br />required by applicable laws, codes and regulations. Please describe all aspects of clothing and safety equipment for the <br />Supplier's installation staff. <br />Safety Procedures: The Supplier will receive a copy of Purchaser's Safety Manual and should follow the procedures <br />X <br />outlined in the Safety Manual. Failure to comply may be considered performance default by the Supplier. Supplier should <br />17 <br />notify Purchaser in writing if it believes there are any conflicts between the Safety Manual and applicable laws, codes and <br />regulations. <br />Arc Flash for Electric EndPoirm Installation: All personnel working on behalf of the Supplier should be dressed in <br />X <br />appropriate PPE category clothing, when working on energized equipment, which corresponds to the Owners Arc -Flash <br />18 <br />Hazard Assessment latest report on file. Purchaser currently requires flame resistant clothing be worn with a minimum <br />c rating of 8 calories per square centimeter. 277/480 volt equipment must be decnergized before being worked on. <br />19 <br />Unsafe conditions should be reported by Supplier immediately to the Utility for resolution. <br />X <br />203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.