My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
224 <br />Inoperable AM Meters. The Supplier should return any inoperable smart meters to Purchaser on a periodic basis, not <br />to exceed monthly. <br />X <br />X <br />225 <br />Acceptance of Work. Acceptance of work by Purchaser will be completed on a cycle-bycycle basis. cycle completion <br />should be based on the measure of those meters on the cycle that have been assigned by Purchaser to Supplier for <br />meter installation. Upon completion of a cycle, the Supplier will request acceptance of the cycle by Purchaser. Then <br />Purchaser should then provide approval or rejection of the request based upon predetermined cycle acceptance <br />guidelines. End <br />Assumptions & Exceptions <br />Supplier: <br />Date <br />File Name <br />See Pricing Instructions document. <br />Requirement Number I Assumption/Exception <br />212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.