My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.24b Attachment II Pricing Response <br />Attachment II.• Pricing (Common Costs) <br />1 <br />Please do not change the format of this form or insert any new rows and/or columns. <br />2 <br />Please return the completed pricing schedule in native Excel. Only fill out the areas shaded yellow. <br />3 <br />For some of the optional services as listed below, please insert the incremental cost. <br />4 <br />While we ask for pricing for the entire account population of approximately 19,000 of endpoints to be installed, it is a <br />requirement for the Supplier to only invoice the cost of the installation after the actual installation has occurred. <br />Key Assumptions: <br />The deployment will consist of two phases. Phase 1 shall consist of installing roughly 150 new electric meters/modules, 20 <br />1 water meter/modules and 10 water retrofit modules with the existing water meters. <br />Fixed Project Charges <br />1 <br />Fixed: Set Up Fees for Electric and Water <br />EndPoint Installation Services <br />Quantity <br />Q <br />Unit Cost for Each <br />Extended Cost <br />Optional Vendor <br />Clarification <br />1.1 <br />Initiation Fee <br />1 <br />$ - <br />$ - <br />1.2 <br />Project Management Fee <br />1 <br />$ 6,800.00 <br />$ 6,800.00 <br />1.3 <br />Meter Installation Software Integration Fee with CIS <br />and GIS <br />1 <br />$ 8,200.00 <br />$ 8,200.00 <br />1.4 <br />System Integration Fee <br />I <br />$ <br />$ - <br />1.4 <br />Phase I Mobilization Charge <br />1 <br />$ 2,500.00 <br />$ 2,500.00 <br />1.5 <br />Phase II Mobilization Fee <br />1 <br />$ 5,000.00 <br />$ 5,000.00 <br />1.6 <br />Other Start -Up Costs (Vendor to describe) <br />1 <br />$ - <br />$ - <br />1.7 <br />Other Start -Up Costs (Vendor to describe) <br />1 <br />$ <br />$ <br />1.8 <br />Other Start -Up Costs (Vendor to describe) <br />1 <br />$ <br />$ - <br />1.9 <br />Performance Bond (final pricing determined at <br />contracting) <br />1 <br />$ 18,539.11 <br />$ 18,539.11 <br />Total Fixed Set -Up Fee <br />$ 41,039.11 <br />2 <br />Incremental Fixed Fees <br />Quantity <br />Unit Cost for Each <br />Extended Cost <br />2.1 <br />Water and Electric Meter Disposal (excluding electric <br />meters of value) <br />$ 0.85 <br />$ - <br />2.2 <br />Revisit Electric <br />100 <br />$ 38.1 <br />$ 3,812.00 <br />2.3 <br />Revisit Water <br />100 <br />$ 13.5 <br />$ 7,345.00 <br />Total Incremental Fixed Fee <br />S 11,157.00 <br />Total One -Time Set -Up Fees <br />$ 52,196.11 <br />Vendor Assumptions <br />We will waive the electric meter portion of the handling fee if EMRU choose the reclamation <br />1 program. Estimated savings $10400 <br />213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.