Laserfiche WebLink
In the event meter tampering is evident, the Supplier may contact Purchaser's Operations or designated Purchaser <br />198 <br />contact and report the violation immediately. The Supplier should also photograph the meter tampering or bypass <br />X <br />situation. <br />199 <br />In the event meter bypass (diversion) is evident, the Supplier should photograph the issue and contact Purchaser <br />X <br />immediately. <br />Meter/Meter Base/Meter Enclosure Damage <br />In the event the Supplier uncovers existing damage to the meter, meter base, meter enclosure, Supplier should report <br />200 <br />the type of problem to Purchaser, re -install the old meter if safe to re -install. <br />X <br />201 <br />In the event the Supplier damages the meter base due to improper insertion of the meter, the Supplier may be <br />X <br />responsible for 100% of the cost of repairs. <br />Bulk Meter Installation Experience <br />Supplier Experience with Similar Sized Utilities as ERMU: Supplier list the deployments of at least four 10,000 to 20,000 <br />X <br />electric AM meter exchange contracts and four water meter exchange contracts with utilities from 3,000 to 10,000 <br />202 <br />water meter exchange engagements that have taken place after January 1, 2020? <br />Yes <br />References: Please list all contracts for meter installation deployments completed from 2020to present. From the list <br />of all deployments, please provide at least three (4) verifiable references (contact names, phone number and emails). <br />203 <br />Purchaser intends to contact these references. Purchaser reserves the right to request additional references. <br />Yes <br />X <br />Resources and Staffing Levels <br />204 <br />Supplier Staffing Plan. Indicate by month the forecasted number of installers and supervisors needed during the <br />X <br />deployment for the water and electric endpoints. <br />205 <br />Resume: Provide the resume for the proposed onsite Supervisor and or Foreman <br />Yes <br />X <br />206 <br />Project Manager Change Out Request: Purchaser has the right to request a new project manager at the discretion of the <br />Yes <br />X <br />Purchaser. <br />Installer Bio's: Please provide resume or bio of the contractors or employees assigned to the purchaser. In the event <br />X <br />207 <br />some of the staff have not been selected at this time pleases the minimum level of experience that you will commit to <br />Yes <br />hiring/assigning for this contract. <br />Safety& Environment <br />208 <br />Please describe Suppliers Safety Assurance program, including all safety training, reporting, auditing, and corrective <br />Yes <br />X <br />actions employed. <br />Environmental Compliance: The Purchaser provides products and services to their customers with consideration to the <br />X <br />impact on the environment. Protecting the environment is one of the Purchaser's core values and Purchaser is <br />committed to delivering products and services in an environmentally sensitive manner. The Purchaser is committed to <br />209 <br />complying with all applicable international, federal, state, and local environmental laws and requirements. Please explain <br />Yes <br />your approach for complying with this specification? <br />Environmental Audits. The Purchaser reserves the right to have an environmental audit performed by the Supplier or <br />X <br />210 <br />an independent third party at any time during the course of the project with respect to any work performed during this <br />Yes <br />project. <br />Inventory Management <br />211 <br />Meter Inventory Level. Describe the Supplier's process for determining the required inventory level to be retained in <br />X <br />warehouse. <br />Inventory Control. Describe the Supplier's experience and proposed inventory control procedures and work flows with <br />X <br />212 <br />regards to receipt, storage, transfer and installation of the Purchaser's' metering assets. <br />Yes <br />Physical Security <br />213 <br />Supplier Facilities Security. The Supplier shall properly lock and secure and operate warehousing and/or cross -dock <br />X <br />facilities. <br />214 <br />Supplier's Physical Security in Warehouse: The Supplier shall secure any use of PC's at the warehouse by locking the PC <br />X <br />on a nightly basis. <br />215 <br />Warehouse Workspace: Purchaser will supply internet access from our warehouse <br />X <br />Miscellaneous <br />Active Accounts Daily FTP Feed from Purchaser: At the start of the engagement, Purchaser will provide a list of account <br />X <br />216 <br />information for active customer accounts. This data will be updated each day or weekly if that is preferred. <br />Yes <br />217 <br />Electric Accounts in DisconnectStatus: Supplier to describe the process for installing AM electric meters where the <br />Yes <br />X <br />meter is in disconnected status. <br />Inspections First 100: Purchaser will provide an inspection of all meters installed for the first 100 electric and water <br />X <br />meters and approve the workmanship before additional meters are installed. Purchaser will complete this task within no <br />218 <br />ore than two business days, and the inspections may also randomly occur during the time of installation. <br />Yes <br />Inspections for New Installers: Purchaser will provide an inspection of all meters installed for the first 50 meters for <br />X <br />219 <br />either Phase 1 or Phase 2 when the Supplier adds a new installer to their crew. <br />Yes <br />New Installers Added: The Supplier must notify Purchaser when the Supplier adds new installation staff at any point of <br />X <br />time within this contract. When notifying Purchase of new staff, then the Supplier must also provide evidence that all <br />220 <br />required background and training approvals have been completed. <br />Inspections After First 500 Meters: A second phase of inspections will be completed by Purchaser after the first 500 <br />X <br />meters and modules are installed. After the inspection, Purchaser will send a written correspondence to the Supplier's <br />Project Manager confirming conformance to the specifications of this RFP or request corrective measures. During this <br />221 <br />second phase of inspections, the Supplier is welcome to co -visit the inspected meters with a Purchaser representative. <br />222 <br />Any work on electric meters other than single-phase, 120/240 volt, 320 amps or less should not be performed by <br />X <br />Supplier. <br />Revisit Trips: Customer Premise Field Investigations— Post Installation. After installation, some small percentage of the <br />X <br />installed AMI meters may require an investigation and resolution for multiple reasons including incorrect installation, <br />failed hardware, software mismatches on the systems, poor communications, etc. For these visits, the vendor to quote <br />223 <br />a per visit cost. The visit should occur within 14 working days from the request by the Purchaser. Supplier may be <br />required to revisit non -performing meters in the deployment area, identify the cause of the problem and when <br />applicable resolve the issue. For budgetary purposes, assume 200 re -visits will be requested. The Supplier may only <br />charge Purchaser for the number of visits completed and should be broken out separately on the monthly invoice. <br />211 <br />