My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5a ERMUSR 02-13-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2024
>
02-13-2024
>
5.5a ERMUSR 02-13-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:23:58 AM
Creation date
2/12/2024 12:40:28 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. New meter numbers scanned for accuracy and compared to preloaded list of available meters. <br />iii. Meter reading dates preloaded to allow utility defined blackout period. <br />iv. Meters cannot be changed out during blackout period. <br />V. Database post processing ensures data integrity and accurate billing. <br />vi. Follow up reporting provided for meters not found in field, or inaccessible for change out after <br />multiple efforts to access site. <br />5.10 High LeveiSecurityandArchitecture <br />C <br />os Ul <br />Web UI <br />♦ Modern Technology Stack <br />♦ 99.9% Uptime <br />♦ Encrypted Web and Mobile access via SSL/TLS <br />♦ Data and file -level encryption <br />♦ Cloud infrastructure protected within Virtual Private Network <br />♦ Redundant backups and clustered database instances <br />♦ SFTP encrypted site for file sharing <br />6.0 High-level Warehousing and Storage <br />1. Material Handling <br />a. Utility issued keys and barrel lock tools will be tracked per technician. <br />b. Technician will return old meters daily <br />i. Old meter serial numbers on outside of box <br />ii. Initials of tech and date on outside of box <br />c. Old meters will be palletized and shrink wrapped <br />2. Metersalvage <br />a. Salvage Meter Process <br />i. Allegiant palletizes and shrink wraps <br />ii. Allegiant will pick up meters Monthly after hold period <br />7. ® Call Center <br />1. Staffed 7 AM— 7 PM CST <br />2. #800 assigned to project <br />151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.