My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 01-17-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
01/17/2006
>
5.1. SR 01-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:42 AM
Creation date
1/13/2006 9:13:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />~ <br /> <br />River <br /> <br />SITE FEASIBILITY STUDY <br />GREAT RIVER REGIONAL LIBRARY SYSTEM <br />CITY OF ELK RIVER <br /> <br />BUDGET IMPLICATIONS <br /> <br />SITE PURCHASE <br /> <br />The historical costs of acquiring the existing properties have not been considered in the <br />evaluation of comparative costs. Site purchase requirements may apply to Site Option A for <br />future expansions. No direct costs have been projected but are factored in the rational for the <br />site recommendation. <br /> <br />SITE DEVELOPMENT COST <br /> <br />Site development costs are usually a minor fraction of the total project budget - especially when <br />considered over the number of years the library is anticipated for use. Site costs still are <br />considered along with other factors in this site analysis and selection process due to budget <br />restrictions. <br /> <br />UTILITY COSTS <br /> <br />. All of the sites require the same utility connections. Cost comparisons are dependent upon the <br />distance or lengths of new utility service connections. Cost projects have been included as they <br />are developed as an appendix to this text. <br /> <br />DEMOLITION COSTS <br /> <br />Demolition costs apply only to the existing library Site Option A - if the assumption that the <br />library will be replaced (versus expanded) is valid. No other demolition costs for the other two <br />sites are required. <br /> <br />ROAD DEVELOPMENT COSTS <br /> <br />The only road construction assumptions apply to Site Option B. If the roadway is constructed, <br />the assumption must be that the street development costs are separate from and not included in <br />the project costs for the construction of the library. <br /> <br />BUILDING COST IMPLICATIONS <br /> <br />Building cost implications are primarily based upon structural requirements based on soil <br />conditions. Identical building programs apply to each of the sites. <br /> <br />ASSESSMENTS <br /> <br />It is assumed there will be no special assessments or charges that might differ from one site to <br />another. <br /> <br />KKE ARCHITECTS: 0606.1159.01 <br /> <br />SITE FEASIBILITY STUDY REPORT <br /> <br />- 33- <br />
The URL can be used to link to this page
Your browser does not support the video tag.