Laserfiche WebLink
<br />~ <br /> <br />River <br /> <br />SITE FEASIBILITY STUDY <br />GREAT RIVER REGIONAL LIBRARY SYSTEM <br />CITY OF ELK RIVER <br /> <br />FiQure 8: Preliminary Site Concept Costs <br />Site Comparisons <br /> <br /> Site "A1" Site "A2~ <br /> AddtnlRenov Den101Rebuild Site "B" Site ~C~ .... <br />Work Item 1.64 acre 1.64 acre 3.2 acre ... 3.3 acre <br />Sitework <br />Structure Demo - Residential $8,850 $8,850 $0 $0 <br />Structure Demo - Exstg Library $0 $44,850 $0 $0 <br />Clearing, Site Surface Removals $7,580 $7,580 $4,800 $4,800 <br />Grading, Earthwork $15,500 $21,200 $35,000 $35,000 <br />Soil corrections I subsurface alterations $0 $0 $20,000 $0 <br />Site Utilities - Water $3,500 $3,500 $11,000 $11,000 <br />Site Utilities - Sewer _ _n~__n_l~OOS>_ $5,000 ______j.9_''O'QQ_ ___.___ .!9-,-000._ <br />1--- - --- ~ - ---- - -- --.----- ---.... ._------~ <br />Site Utilities - Storm Drain $7,500 $10,000 $15,000 $15,000 <br />Site Utilities - PUC's (power gas) $0 $0 $5,000 $5,000 <br />~!iveway~2..Ql!.~~~________________ - ---- ----. ------.._--- $0 -. __ $0_ ~_ _ ____~E,~<>Q. .--- -- E.EQQ <br />Site Access/Control (Off Site Development) $0 $0 $75,000 $0 <br />Total Preliminary Site Development $47,930 $100,980 $182,300 $87,300 <br />Building Construction/Renovation <br />New Construction (14,000-16,000 sf) $0 $2,240,000 $2,560,000 $2,560,000 <br />Addition/Renovation (14,000 sf) $1,230,000 <br />Total Preliminary Building Canst Costs $1,230,000 $2,240,000 $2,560,000 $2,560,000 <br />Total Preliminary Bldg & Site Devel Costs $1,277,930 $2,340,980 $2,742,300 $2,647,300 <br /> <br />Notes: <br /> <br />The costs noted above are preliminary cost estimates for direct construction only. Costs for <br />fees, services, and furniture, fixtures, and equipment are not included in the preliminary <br />estimate. These costs could range from 25% to 30% of direct construction costs. <br /> <br />The option for Site "8" assumes there must be an allowance for soil corrections at the old "main <br />streef abandoned route. Site "8" also requires the construction of a new access road <br />development to the designated site area. <br /> <br />Site "A" and "A2" are based upon a 14,000 square foot building - the maximum area that can be <br />constructed on the site through additions or new replacement structures. Site "8" and "c" are <br />based upon an original footprint of up to 16, 000 square feet. <br /> <br />KKE ARCHITECTS: 0606.1159.01 <br /> <br />SITE FEASIBILITY STUDY REPORT <br /> <br />- 34- <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />