My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 01-17-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
01-17-2023
>
4.3 SR 01-17-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:36:04 AM
Creation date
1/12/2023 3:36:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PR <br />PR NO. <br />13 <br />RFI <br />RFI NO. <br />N/A <br />CDR <br />DATE CDR NO. <br />11/23/2021 54 <br />DESCRIPTION OF CHANGE <br />PR#13- Steam Generator <br />CHANGE STATUS <br />CDR STATUS CC ARGE TO OPEN CDR APPROVED COR'S: AIA CO NO. <br />ONTINGENCY AMOUNT CO AMOUNT <br />Contingency $8,342.00 1 <br />SUB STATUS <br />GO SENT TO SUB <br />yes <br />N/A <br />N/A <br />12/1/2021 <br />55 <br />Horizon Overtime performed on 11/6 <br />Contingency <br />$2,682.00 <br />1 <br />yes <br />N/A <br />N/A <br />12/2/2021 <br />56 <br />Operable Partition Material <br />Contingency <br />$2,135.02 <br />1 <br />yes <br />N/A <br />126 <br />12/7/2021 <br />57 <br />Revised Fixturefor KS-1 Sink per RFI#126 <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />N/A <br />12/9/2021 <br />58 <br />Training Tower Manhole <br />Contingency <br />$3,878.25 <br />1 <br />yes <br />18 <br />N/A <br />12/20/2021 <br />59 <br />PR#18-Trash Units <br />Contingency <br />$3,463.40 <br />1 <br />yes <br />19 <br />N/A <br />12/28/2021 <br />60 <br />PR#19- Wellness Room Floor <br />Contingency <br />$5,150.00 <br />1 <br />yes <br />N/A <br />143 <br />12/29/2021 <br />61 <br />RFI#143- CPT-2 LokDots <br />Contingency <br />$215.00 <br />1 <br />yes <br />N/A <br />150 <br />1/3/2022 <br />62 <br />Lowering Non -Structural CMU Walls at Mezz <br />Contingency <br />$691.00 <br />1 <br />yes <br />N/A <br />N/A <br />1/5/2022 <br />63 <br />ASI#10- Interior Finishes <br />Contingency <br />($327.00) <br />1 <br />yes <br />N/A <br />N/A <br />1/6/2022 <br />64 <br />ASI#11-Wellness Room Lighting Controls <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />154 <br />1/10/2022 <br />65 <br />RFI#154 Tile Backer Board at Wellness Room <br />Contingency <br />$5,688.00 <br />1 <br />yes <br />N/A <br />N/A <br />1/10/2022 <br />66 <br />Skim Coating and Laminating CMU <br />Contingency <br />$10,300.00 <br />1 <br />yes <br />N/A <br />159 <br />1/19/2022 <br />67 <br />RFI#159 Training Tower Manhole Welding <br />Contingency <br />$424.00 <br />1 <br />yes <br />N/A <br />156 <br />1/20/2022 <br />68 <br />RFI#156- App Bay Fan and Duct Work Conflict <br />Contingency <br />$3,513.29 <br />1 <br />yes <br />ASI#11 <br />N/A <br />1/20/2022 <br />69 <br />ASI#11 Wellness Room Lighting Controls <br />Contingency <br />$1,319.00 <br />1 <br />yes <br />N/A <br />160 <br />1/26/2022 <br />70R <br />App Bay Lights <br />Contingency <br />$3,395.00 <br />1 <br />yes <br />N/A <br />146 <br />1/26/2022 <br />71 <br />JPVC Pipe Insulation <br />Contingency <br />$723.00 <br />1 <br />yes <br />N/A <br />167 <br />1/26/2022 <br />72 <br />Air Drop Duct Relocation <br />Contingency <br />$5,688.00 <br />1 <br />yes <br />N/A <br />N/A <br />2/3/2022 <br />73R <br />OPTION-1,Hilti 572 Spray and Paint at TOW per 4+9/A660- <br />Contingency <br />$4,613.00 <br />1 <br />yes <br />N/A <br />140/2 <br />217/2022 <br />74 <br />Weldable Raqppelling Anchors <br />Contingency <br />$2,355.82 <br />1 <br />yes <br />21 <br />171 <br />2/7/2022 <br />75 <br />PR#21- RFI#171 <br />Contingency <br />$1,120.00 <br />1 <br />yes <br />N/A <br />163 <br />2/9/2022 <br />76R <br />RFI#163- StairTower4th Floor Roofing Membrane <br />Contingency <br />$4,578.00 <br />1 <br />yes <br />N/A <br />173 <br />2/9/2022 <br />77 <br />Contingency <br />$395.00 <br />1 <br />yes <br />20 <br />N/A <br />2/10/2022 <br />78 <br />Architectual, Interior, and Technology Revisions per PR#20 <br />Contingency <br />($1,679.00) <br />1 <br />yes <br />22 <br />N/A <br />2/11/2022 <br />79 <br />PR#22- Added 3 way control valve for In -floor heat <br />Contingency <br />$709.00 <br />1 <br />yes <br />N/A <br />183 <br />2/22/2022 <br />80 <br />Revised Surface Mounted Exhaust Air Registers <br />Contingency <br />$2,503.00 <br />1 <br />yes <br />N/A <br />N/A <br />2/25/2022 <br />81 <br />Revised Interior Signage List <br />Contingency <br />($572.82) <br />1 <br />yes <br />N/A <br />181 <br />2/28/2022 <br />82 <br />RFI#181- SF 140X Head Detail <br />Contingency <br />$312.00 <br />1 <br />1 <br />yes <br />N/A <br />139 <br />2/28/2022 <br />83 <br />Duct Protection Cages <br />Contingency <br />($470.00) <br />1 <br />yes <br />N/A <br />187 <br />3/1/2022 <br />84 <br />Added GFCI recptacles within Laundry Areas <br />Contingency <br />$1,503.00 <br />1 <br />yes <br />N/A <br />N/A <br />3/4/2022 <br />85 <br />Apparatus Bay Moisture Mitigation <br />Contingency <br />$6,565.00 <br />1 <br />yes <br />N/A <br />N/A <br />3/11/2022 <br />86 <br />Wellness Room 135 Bench <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />203 <br />4/6/2022 <br />87 <br />RFI#203 G1 Training Tower Light Fixture <br />Contingency <br />$1,427.00 <br />1 <br />yes <br />N/A <br />N/A <br />4/8/2022 <br />88 <br />Irrigation Controller <br />Contingency <br />$1,132.00 <br />1 <br />yes <br />N/A <br />194 <br />4/12/2022 <br />89 <br />2/1 Granular Fill at App Bay Aprons <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />210 <br />4/12/2022 <br />90 <br />App Bat Sectional Door Control Station <br />Contingency <br />$2,790.00 <br />1 <br />yes <br />N/A <br />N/A <br />5/6/2022 <br />91R <br />Flammable Wsate Vent Piping Relocation <br />Contingency <br />$3,169.00 <br />1 <br />yes <br />23 <br />N/A <br />4/25/2022 <br />92R <br />Trash Enclosure Gate <br />Contingency <br />$3,754.55 <br />1 <br />yes <br />N/A <br />212 <br />4/25/2022 <br />93 <br />Electronically Operated Valve for Natural Gas Piping <br />Void <br />N/A <br />1 <br />N/A <br />25 <br />N/A <br />4/26/2022 <br />94 <br />Decontamination Vestibule Flooring <br />Contingency <br />$2,851.00 <br />1 <br />yes <br />24 <br />N/A <br />4/26/2022 <br />95 <br />Training Tower Lintel <br />Contingency <br />$833.64 <br />1 <br />yes <br />N/A <br />N/A <br />4/28/2022 <br />96 <br />Aggregate Base for Concrete Along North App Bay <br />Contingency <br />$2,455.20 <br />1 <br />yes <br />N/A <br />N/A <br />5/4/2022 <br />97 <br />Dryden Excavating Escalation <br />Contingency <br />$3,000.00 <br />1 <br />yes <br />N/A <br />N/A <br />5/4/2022 <br />98 <br />Asphalt Paving Escalation <br />Contingency <br />$3,588.30 <br />1 <br />yes <br />N/A <br />218 <br />5/11/2022 <br />99 <br />Cleveland Ave Existing CB Grate <br />S814.69 <br />1 <br />yes <br />N/A <br />N/A <br />5/12/2022 <br />100 <br />In -Wall Backing for range Hood Vent <br />Contingency <br />$1,066.25 <br />1 <br />yes <br />N/A <br />199 <br />5/23/2022 <br />101 <br />jAdditional Wind Bracing at App Bay Joist <br />Contingency <br />$424.00 <br />1 <br />yes <br />N/A <br />N/A <br />5/27/2022 <br />102 <br />CMU for Grill Station <br />Contingency <br />$0.00 <br />1 <br />yes <br />N/A <br />N/A <br />5/27/2022 <br />103 <br />Credit for Colored Concrete <br />Contingency <br />($541.20) <br />1 <br />yes <br />N/A <br />221 <br />5/31/2022 <br />104 <br />Exterior Trench Drain Concrete Pour <br />S1.776.21 <br />1 <br />yes <br />N/A <br />225 <br />6/1/2022 <br />105 <br />RPZ for Irrigation Feed <br />Contingency <br />$947.00 <br />1 <br />yes <br />N/A <br />N/A <br />6/2/2022 <br />106 <br />IP Dialer for FA Monitoring <br />Contingency <br />$578.00 <br />1 <br />yes <br />N/A <br />224 <br />6/7/2022 <br />107 <br />Concrete Paving to Trench Drain Tie -In <br />Contingency <br />$1,779.23 <br />1 <br />yes <br />27 <br />226 <br />6/20/2022 <br />108 <br />PR#27- Training Tower Lighting <br />S3,663.00 <br />1 <br />yes <br />N/A <br />229 <br />6/23/2022 <br />109 <br />Swing Gate for Decorative Metal Fencing <br />Contingency <br />$1,113.00 <br />1 <br />yes <br />26 <br />N/A <br />9/21/2022 <br />11OR <br />PR#26- Exterior Signage Elevation <br />Contingency <br />$11,190.85 <br />1 <br />yes <br />N/A <br />N/A <br />7/18/2022 <br />111 <br />Pergola Substitution <br />Contingency <br />($11,023.27) <br />1 <br />yes <br />N/A <br />N/A <br />8/3/2022 <br />112 <br />Alternative Operable Partition <br />Contingency <br />$9,544.91 <br />1 <br />yes <br />28 <br />N/A <br />8/3/2022 <br />113 <br />PR#28 Epoxy Guidelines <br />Void <br />1 <br />N/A <br />N/A <br />233 <br />8/8/2022 <br />114 <br />Lights at Pergola <br />Contingency <br />($402.00) <br />1 <br />yes <br />N/A <br />8/19/2022 <br />115 <br />Omitting WC-1 in Dayroom <br />Contingency <br />($1,475.00) <br />1 <br />yes <br />N/A <br />9/2/2022 <br />116 <br />Polished Concrete Covering/Protection <br />Void <br />1 <br />N/A <br />rA <br />N/A <br />9/28/2022 <br />117 <br />Transfer ERPS Contingency Balance to ERFS#3 <br />Contingency <br />($3001280) <br />$30,012.80 <br />1 <br />N/A <br />N/A <br />9/28/2022 <br />118 <br />Exterior C-Top <br />Contingency <br />$2,858.69 <br />1 <br />yes <br />Construction Change Order Log 10232018 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.