Laserfiche WebLink
nTerra <br />UCTION <br />21025 Commerce Blvd, Suite 1000 <br />Rogers, MN 55374 <br />763.463.0220 <br />Date: 12/29/2022 <br />Project: Elk River Fire Station #3 <br />Change Order Log <br />k- <br />PR <br />PR NO. <br />N/A <br />RFI <br />RFI NO. <br />1 <br />I CDR <br />DATE CDR NO. <br />TBD 1 <br />CHANGE LOG <br />CHANGE STATUS SUB STATUS <br />DESCRIPTION OF CHANGE COR STATUS CHARGE TO OPEN CDR APPROVED CDR's <br />CONTINGENCY AMOUNT CO AMOUNT AIA CO NO. COSENTTOSUB <br />RFI#1 Void 1 N/A <br />1 <br />N/A <br />4/6/2021 <br />2R <br />PR#01 Clerestory Head Detail <br />Contingency <br />$11,782.35 <br />1 <br />yes <br />4 <br />N/A <br />3/29/2021 <br />3 <br />PR#04 Stepped Footings <br />Contingency <br />$4,084.00 <br />1 <br />yes <br />7 <br />N/A <br />4/5/2021 <br />4 <br />PR#07Water service <br />Contingency <br />($3,362.12) <br />1 <br />yes <br />6 <br />N/A <br />4/6/2021 <br />5 <br />PR#06 Generator and Transformer <br />Contingency <br />($19,350.00) <br />1 <br />yes <br />5 <br />N/A <br />1 4/7/2021 <br />6 <br />1PR#05 Salvaged Steel Bollards <br />Contingency <br />($1,232.00) <br />1 <br />yes <br />N/A <br />N/A <br />4/8/2021 <br />7 <br />Additional Construction Entrances <br />Void <br />N/A <br />1 <br />N/A <br />2 <br />N/A <br />4/9/2021 <br />8 <br />PR#2 Overhead Doors and Circuiting <br />Contingency <br />($36,149.00) <br />1 <br />yes <br />3R <br />N/A <br />4/23/2021 <br />9 <br />PR#03R Duct and Ceiling Revisions <br />Contingency <br />$3,862.00 <br />1 <br />yes <br />N/A <br />N/A <br />4/28/2021 <br />10 <br />Increased joist loads for RTU <br />Contingency <br />$1,305.28 <br />1 <br />yes <br />N/A <br />N/A <br />5/6/2021 <br />N/A <br />ERMU Permits <br />Contingency <br />$1,033.46 <br />1 <br />N/A <br />N/A <br />N/A <br />5/10/2021 <br />11 <br />ASI-2 Civil Structure Elevation <br />Contingency <br />$6,096.75 <br />1 <br />yes <br />10 <br />N/A <br />5/24/2021 <br />12 <br />PR#10- Condensate <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />19 <br />5/24/2021 <br />13 <br />ASH and RFI-19 <br />Contingency <br />($2,625.00) <br />1 <br />yes <br />N/A <br />N/A <br />5/24/2021 <br />14 <br />Door Hardware Revisions <br />Contingency <br />$2,152.97 <br />1 <br />yes <br />9 <br />N/A <br />6/1/2021 <br />15 <br />PR#9 Owner Review Items <br />Void <br />N/A <br />1 <br />N/A <br />8 <br />N/A <br />6/2/2021 <br />16 <br />PR#8 Expansion Tank <br />Contingency <br />$2,504.00 <br />1 <br />yes <br />N/A <br />21 <br />6/3/2021 <br />17 <br />1 RFI#21 Galvanized Angle at Brick Veneer <br />Void <br />N/A <br />1 <br />N/A <br />N/A <br />33 <br />6/11/2021 <br />18 <br />RFI#33 Added Footings Steps for Storm Sewer Piping <br />Contingency <br />$600.00 <br />1 <br />yes <br />N/A <br />37 <br />6/11/2021 <br />19 <br />RFI#37 Extended Foundation Wall at Masonry Pilasters <br />Contingency <br />$550.00 <br />1 <br />yes <br />N/A <br />N/A <br />6/22/2021 <br />20 <br />Footing steps for domestic water and stoop along GL-8 <br />Contingency <br />$2,480.00 <br />1 <br />yes <br />10R <br />N/A <br />6/25/2021 <br />21 <br />PR#10R-Storm Shelter Door Hardware <br />Contingency <br />$1,875.00 <br />1 <br />yes <br />N/A <br />N/A <br />6/28/2021 <br />22R <br />ASI-4R Training Tower Lighting Controls <br />Contingency <br />$8,136.00 <br />1 <br />yes <br />12 <br />N/A <br />6/30/2021 <br />23 <br />PR#12- Overhead Sectional Dors <br />Contingency <br />($36,410.00) <br />1 <br />yes <br />N/A <br />21 <br />8/5/2021 <br />24R <br />ASI-5 <br />Contingency <br />$13,411.00 <br />1 <br />yes <br />9R <br />N/A <br />7/15/2021 <br />25 <br />PR#9R- Overhead Truck Fill <br />Contingency <br />$32,991.00 <br />1 <br />yes <br />N/A <br />54 <br />7/27/2021 <br />26 <br />RFI#54- Head Detail at 202CX and 302CX <br />Contingency <br />$1,406.22 <br />1 <br />yes <br />N/A <br />46 <br />7/27/2021 <br />27 <br />RFI#46- Training Tower Trench Drain Architectual Detail <br />Contingency <br />$415.34 <br />1 <br />yes <br />N/A <br />N/A <br />7/30/2021 <br />28R <br />C-900 Municipal Water Piping <br />Contingency <br />$278.65 <br />1 <br />yes <br />N/A <br />N/A <br />8/3/2021 <br />29 <br />Eye Wash Station <br />Contingency <br />($949.00) <br />1 <br />yes <br />N/A <br />69 <br />8/27/2021 <br />30 <br />RFI#69 Apparatus Bay OH Door Jamb Angle <br />Contingency <br />($3,098.93) <br />1 <br />yes <br />N/A <br />N/A <br />9/7/2021 <br />31 <br />LT GA 3x3 Cavity Closure Angle Installation <br />Contingency <br />$1,272.00 <br />1 <br />yes <br />N/A <br />N/A <br />9/15/2021 <br />32R <br />ASI-8R-Roof Transitions <br />Contingency <br />$4,684.52 <br />1 <br />yes <br />N/A <br />78 <br />9/14/2021 <br />33 <br />RFI#78-Extended Wall Track <br />Contingency <br />$637.00 <br />1 <br />yes <br />15 <br />N/A <br />9/15/2021 <br />34 <br />PR#15- Flagpoles. Revised (2) flagpoles to be 25' <br />Contingency <br />($277.00) <br />1 <br />yes <br />14 <br />N/A <br />9/16/2021 <br />35 <br />PR#14- Parapet Roofing Membrane <br />Contingency <br />($1,650.00) <br />1 <br />yes <br />N/A <br />92 <br />9/21/2021 <br />36 <br />RFI#92- Slab Edge Detail at Mezzanine Opening <br />Contingency <br />$230.00 <br />1 <br />yes <br />N/A <br />73 <br />9/21/2021 <br />37 <br />RFI#73- Loose Lintels at Training Tower <br />Contingency <br />$512.65 <br />1 <br />yes <br />16 <br />N/A <br />9/27/2021 <br />38R <br />PR#16- Operable Partition <br />Contingency <br />$4,179.44 <br />1 <br />yes <br />N/A <br />94 <br />9/28/2021 <br />39 <br />RFI#94 Slab on Grade Elevation Clarification at Trash Enclosure <br />Contingency <br />$962.50 <br />1 <br />yes <br />N/A <br />N/A <br />10/4/2021 <br />40 <br />ASI#9-Dayroom <br />Contingency <br />$858.00 <br />1 <br />yes <br />N/A <br />N/A <br />10/5/2021 <br />41 <br />Aggregate Base at 191st intersection <br />Contingency <br />($845.28) <br />1 <br />yes <br />17 <br />N/A <br />10/11/2021 <br />42 <br />PR#17- SCBA Compressor <br />Contingency <br />$3,144.00 <br />1 <br />yes <br />N/A <br />N/A <br />10/13/2021 <br />43 <br />3" Crushed Rock at West Side of Site <br />Contingency <br />$3,935.75 <br />1 <br />yes <br />N/A <br />N/A <br />10/13/2021 <br />44 <br />Apparatus Bay Muck Out <br />Contingency <br />$2,103.84 <br />1 <br />yes <br />N/A <br />N/A <br />10/15/2021 <br />45 <br />Concrete at North Side of Site <br />Contingency <br />$6,193.62 <br />1 <br />yes <br />N/A <br />96 <br />10/19/2021 <br />46 <br />RFI#96 <br />Contingency <br />$1,655.00 <br />1 <br />yes <br />N/A <br />N/A <br />10/20/2021 <br />47 <br />Soil Corrections <br />Contingency <br />$6,917.00 <br />1 <br />yes <br />N/A <br />103 <br />10/26/2021 <br />48 <br />RFI#103-Angles Above W1 Windows <br />Contingency <br />$1,486.67 <br />1 <br />yes <br />N/A <br />110 <br />11/24/2021 <br />49R <br />Wood Blocking per RFI#110 <br />Contingency <br />$334.35 <br />1 <br />yes <br />N/A <br />100 <br />11/11/2021 <br />50 <br />RFI#100 Roof to Wall Transition at App Bay <br />Contingency <br />$5,300.64 <br />1 <br />yes <br />N/A <br />111 <br />11/11/2021 <br />51 <br />RFI#111- Dryer Vent Piping Through Roof <br />Void <br />N/A <br />1 <br />N/A <br />rN/A <br />117 <br />11/17/2021 <br />52 <br />RFI#117, Added J-Box for Stools at Bathrooms 131 and 133 <br />Contingency <br />$983.00 <br />1 <br />yes <br />N/A <br />118 <br />12/3/2021 <br />53R <br />RFI#118- Automatic Push Pad Installation <br />Contingency <br />$437.00 <br />1 <br />yes <br />Construction Change Order Log 10232018 Page 1 of 3 <br />