Laserfiche WebLink
PR: <br />FIR NO. <br />N/A <br />.RErr <br />RF1 NO. <br />N/A <br />COR <br />DATE <br />9/28/2022 <br />CDR NO. <br />119 <br />CHANGE LOG <br />DESCRIPrION OF CHANGE <br />ExteriorG-Grill <br />CDR STATUS <br />Contingency <br />CHANGE STATUS <br />CHIA ETD OPEN CDR APPROVED COR'S <br />CONTINGENCY AMOUNT CO AMOUNT AIA CO NO. <br />$2,100.00 1 <br />SUBSTATUS <br />CO SENT TO SUB <br />yes <br />N/A <br />N/A <br />9/28/2022 <br />120 <br />Additional Costs for Exterior Pressure Washing/Cleanup <br />Contingency <br />$3,924.98 <br />1 <br />yes <br />N/A <br />N/A <br />9/28/2022 <br />121 <br />Paint Interior Trench Drain Grates <br />Contingency <br />$2,722.16 <br />1 <br />yes <br />N/A <br />N/A <br />9/28/2022 <br />122 <br />Asphalt patch at trail <br />Contingency <br />$5,000.00 <br />1 <br />yes <br />N/A <br />N/A <br />9/28/2022 <br />123 <br />New Horn Strobe - relocate away from steam room <br />Contingency <br />$509.25 <br />1 <br />yes <br />N/A <br />N/A <br />10/6/2022 <br />124 <br />Patch Stone Veneer to match <br />Contingency <br />$1,968.00 <br />1 <br />yes <br />N/A <br />N/A <br />12/7/2022 <br />125R <br />Polished Concrete Repairs Credit <br />($1,068.00) <br />2 <br />yes <br />N/A <br />N/A <br />12/29/2022 <br />126 <br />General Conditions associated with Phasing Change <br />Contingency <br />$2,238.19 <br />2 <br />N/A <br />N/A <br />N/A <br />12/29/2022 <br />127 <br />Contingency Reconciliation -Credit Remaining Contingency <br />Contingency <br />$2,238.19 <br />($2,238.19) <br />2 <br />N/A <br />SUBTOTAL: <br />$145.803.75 <br />$0.00 <br />$32,960.51 <br />GUARANTEED MAXIMUM PRICE (GMP) <br />CONTRACT: <br />CURRENT CONTRACT VALUE: <br />(Original Contract+ Change Orders) <br />PROJECTED CONTRACT VALUE: (Current <br />Contract + Pending COR's) <br />CONTINGENCY REMAINING: ($145,803.75 - <br />Pending COR's) <br />,246.00 <br />,206.51 <br />,206.51 <br />Construction Change Order Log 10232018 Page 3 of 3 <br />