My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 01-17-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
01-17-2023
>
4.3 SR 01-17-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:36:04 AM
Creation date
1/12/2023 3:36:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-' Document G701 "' - 2017 <br />Change Order <br />PROJECT: (Name and address) <br />20-705 Elk River Fire Station #3 <br />OWNER: (Name and address) <br />City of Elk River <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />CONTRACT INFORMATION: <br />Contract For: General Construction <br />Date: October 19, 2020 <br />ARCHITECT: (Name and address) <br />BKV Group <br />222 N 2nd St, #101 <br />MInneapolis, MN 55401 <br />CHANGE ORDER INFORMATION: <br />Change Order Number: 20-705-002 <br />Date: January 3, 2023 <br />CONTRACTOR: (Name and address) <br />Terra General Contractors <br />21025 Commerce Blvd Ste 1000 <br />Rogers MN 55374 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />Description: Change order to reconcile the changes to the project per the attached change log dated 12/29/2022. Includes the <br />following revisions to the GMP: <br />COR #125R: ($1,068.00) <br />COR #127: ($2,238.19) <br />Contingency revision balance = $0.00 <br />The original Guaranteed Maximum Price was $ 6,898,246.00 <br />The net change by previously authorized Change Orders $ 36,266.70 <br />The Guaranteed Maximum Price prior to this Change Order was $ 6,934,512.70 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ 3,306.19 <br />The new Guaranteed Maximum Price including this Change Order will be $ 6,931,206.51 <br />The Contract Time will be increased by Zero (0) days. <br />The new date of Substantial Completion will be <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />BKV Group <br />ARCHITECT (Firm name) <br />1&141 - <br />SIGNATURE <br />Michael Healy, AIA <br />PRINTED NAME AND TITLE <br />01 /04/2023 <br />DATE <br />Terra General Contractors <br />CONTRA OR (Firm name) <br />SIG VAfU �' /�.!� / tcsGcn 01,4" ) 1 V F� <br />PRINTED NAME AND TITLE <br />Il?/Z,0Z3 <br />IT-A0 <br />Citv of Elk River <br />OWNER (Firm name) <br />SIGNATURE <br />Brandon Wisner, Engineering PM <br />PRINTED NAME AND TITLE <br />1-5-2023 <br />DATE <br />AIA Document G701- — 2017. Copyright @ 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document <br />was produced by AIA software at 11:04:24 CT on 01/03/2023 under Order No.2114310719 which expires on 04/24/2023, is not for resale, is licensed for one- <br />time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />copyright@aia.org. <br />User Notes: (369ADA33) <br />
The URL can be used to link to this page
Your browser does not support the video tag.