Laserfiche WebLink
6/302022 Exhibit B-1 Page 7 of 12 <br />SRF Consulting Group, Inc <br />Client: Sherburne County <br />Project: CSAH 33 Auburn Street to CSAH 13 (Twin Lakes Road) <br />Amendment No. 2 - Future Trail / Storm Sewer Design <br />Subconsultants: <br />TASK NO. TASK DESCRIPTION <br />3.1.14 Review driveway grades along both sides of CSAH 33 to accountfor shifted <br />alignment and future trail along south side. Make appropriate adjustments to <br />driveway grades as deemed necessary. <br />3.1.15 Stormwater/ Drainage design <br />3.1.15.1 Stormwater treatment ditch revisions <br />3.1.15.2 Catch basin spacing and storm sewer design to State Aid standards from 400 ft <br />west of Auburn St. to Quincy St. <br />3.1.15.3 Catch basin spacing and storm sewer design (1,500 feet) to State Aid standards <br />from 100 ft west of planned cattle pass to the proposed roundabout. <br />3.1.15.4 Prepare additional Drainage Quantities and Tabulations for 60%, 95%and 100% <br />Plan submittals (beyond what was included for culverts in original scope). <br />3.1.15.5 Review drainage ditches and coordinate special ditch profiles. <br />3.1.15.6 Update Drainage Map for revisions and document future trail <br />3.1.16 Update previous 30% Construction Plans to incorporate revisions for future trail, <br />storm sewer system and extended project limits to TH 169. Revised Sheets include <br />updates or creating additional sheets for the following: <br />Title Sheet <br />General Layout <br />Inplace Utility Tabulation <br />Typical Sections <br />Alignment Plans and Tabulations <br />Topography and Utility Plans <br />Construction Plan and Profile <br />Profiles <br />Drainage and Superovulation Plans <br />Drainage Profiles, Tabulations and Details <br />Storm Water Pollution Prevention Plan (SWPPP) <br />Contour Plans <br />Cross Sections <br />3.1.17 Prepare updated 30% Cost Estimate using SRF 1-pager cost estimate tool. <br />3.1.1E Perform a QC check of revised 30% Plan package (plans and cost estimate), <br />document comments and complete recommended corrections. <br />3.1.19 Submit 30% Construction Plans to County and City for review and comment.(PDF <br />document) <br />3.1.20 Receive 30% review comments from County and City, update Comment Resolution <br />tracking document. Respond to comments. <br />3.1.21 Additional quantities, documentation and effort to tabulate quantities will be <br />required, beyond the original Contract, for County and City cost participation. Items <br />include but are not limited to: mobilization, earthwork, storm sewer and temporary <br />easements. <br />3.1.22 Prior/ ongoing design services to review project corridor for the trail, update <br />geometry file, update layout, update typical sections, update Civil 3D templates for <br />urban trail and process cross sections. Prepare cost estimates, prepare for and <br />attend client meetings to discuss trail, prepare trail memo to document trail <br />decision making process and detailed design elements. <br />Work Tasks and Person -Hour Estimates <br />PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I <br />4 S <br />'SRF <br />13725.00 <br />TECH. SUPPORT TOTALS EST.FEE <br />12 $1,456.00 <br />3 - - - 13 - - <br />15 <br />- 31 <br />$3,964.00 <br />10 - - - 32 - - <br />70 <br />- 112 <br />$14,165.00 <br />3 - - - S - - <br />10 <br />- 21 <br />$2,754.00 <br />2 - - - 6 - - <br />17 <br />- 25 <br />$3,135.00 <br />2 - - 4 12 - - <br />- <br />- 18 <br />$2,452.00 <br />- - - - 1 - - <br />2 <br />- 3 <br />$360.00 <br />3 - - 20 - 40 20 <br />- <br />- S3 <br />$9,962.00 <br />1 - - 4 <br />- S - <br />- - 13 <br />$1,650.00 <br />4 - - 4 <br />- 6 - <br />- - 14 <br />$2,012.00 <br />- - - 2 <br />- 4 - <br />- - 6 <br />$725.00 <br />2 - - 6 <br />- 4 - <br />- - 12 <br />$1,692.00 <br />- - - S <br />- 20 - <br />- - 2S <br />$3,352.00 <br />40 - - 100 <br />- 12 - <br />- - 152 <br />$23,45O.00 <br />13725 Amd_2_Rev3.alsx <br />SRF CONSULTING GROUP, INC. MINNEAPOLIS. MN <br />