My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.5 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:58 AM
Creation date
10/13/2022 2:53:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/30/2022 <br />SRF Consulting Group, Inc. <br />Client: Sherburne County <br />Project: CSAH 33 Auburn Street to CSAH 13 (Twin Lakes Road) <br />Amendment No. 2 - Future Trail / Storm Sewer Design <br />Subconsultants: <br />TASK NO. TASK DESCRIPTION <br />3.1.23 Prepare Amendment#2 for additional design scope for future trail planning. <br />3.1.24 Update project layout including color file, typical sections and notes for use with <br />Public Open House No. 2. Future trail will be depicted on layout for public <br />comment. Provide QC check of layout, make recommended revisions, submit to <br />County and City for review. <br />3.1.25 Update Infraworks model and fly through for public open house #2. <br />3.1.25.1 Update Infraworks model and hatchingfor shifted alignment. Prep model for usage <br />by video experts. Future trail will not be modeled in 3D and construction limits will <br />be based upon current proposed construction, not future trail impacts. <br />3.1.25.2 Video editing, sync timing, review video and final edits. Coordinate depiction of <br />future trail overlaid on Infraworks model. <br />3.1.26 Update overall project schedule to reflect additional design work detailed above to <br />incorporate future trail and accountfor schedule delays due to trail decision <br />process. <br />3.2.2 Revise previous wetland delineation graphics to reflectthe proposed shifted <br />alignment of CSAH 33. Coordinate with TEP panel on revised graphics and confirm <br />if additional review is required. If additional review needed, resubmit previous <br />wetland delineation report for TEP panel sign off. <br />SRF Deliverables: <br />- Revised 30%Construction Plans and Estimate (pdf) <br />-Amendment #2 <br />- Revised Project Layout& Drainage Area Map <br />- Revised Intersection Sight Distance calculations <br />- Infraworks Fly-Thru video (updated) <br />- Additional/revised wetland delineation graphics <br />SUBTOTAL - TASK 3.0 <br />4.0 RIGHT OF WAY ACQUISITION <br />Assumptions: <br />- No additional right of way parcels required for proposed centerline of CSAH 33 <br />north. <br />Client Deliverables: <br />None <br />4.1 No tasks required. <br />SRF Deliverables: <br />None <br />SUBTOTAL - TASK 4.0 <br />Exhibit B-1 <br />Work Tasks and Person -Hour Estimates <br />Page 8 of 12 <br />'SRF <br />13725.00 <br />PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH. SUPPORT TOTALS EST. FEE <br />24 - - 10 - - - - - 34 $6,096.00 <br />2 - - 6 - 14 - - - 22 $2,792.00 <br />1 - - 16 - 4 - - - 21 $2,93S.00 <br />1 6 - - - - - - 6 13 $1,934.00 <br />4 - - 20 - - - - - 24 $3,656.00 <br />- 4 - - - - 4 - - S $1,120.00 <br />120 10 <br />0 0 <br />0 315 <br />0 0 <br />72 156 <br />0 0 <br />32 114 <br />0 0 <br />6 825 $113,980.00 <br />- 0 $0.00 <br />0 0 $0.00 <br />13725 Amd_2_Rev3.alsx <br />SRF CONSULTING GROUP, INC. MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.