My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.5 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:58 AM
Creation date
10/13/2022 2:53:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/302022 Exhibit B-1 Page 6 of 12 <br />SRF Consulting Group, Inc <br />Client: Sherburne County <br />Project: CSAH 33 Auburn Street to CSAH 13 (Twin Lakes Road) <br />Amendment No. 2 - Future Trail / Storm Sewer Design <br />Subconsultants: <br />TASK NO. TASK DESCRIPTION <br />Client Deliverables: <br />- Review of 30% Plans (2nd submittal package) <br />- Review of updated preliminary layout, cost estimates and memos associated with <br />the future trail accommodation. <br />- State Aid project number provided by City of Elk River <br />3.1.1 Provide additional project management including day to day check -ins with staffto <br />assure project remains on the revised schedule due to additional of trail. <br />3.1.2 Provide design supportto assist with restartingthe CATEX document to reflect the <br />changes to the project. <br />3.1.3 Receive additional topographical points and data (County to perform survey) along <br />north project limits to update base files, and existing 3D model (if deemed <br />necessary). <br />3.1.4 Review CSAH 33 alignment. Layout proposed 10-11 foot shift north from Auburn <br />Street thru Smith Street and from Quincy Street east to the west channelization for <br />the roundabout. Modify alignment to reflect final alignment. Coordinate alignment <br />shift with County. <br />3.1.5 Update the geometry basefile to reflectthe proposed CSAH 33 shift. Update <br />includes mainline, left bypass lanes, driveways, side street connections and other <br />affected geometry. Update includes showingthe future trail location for <br />schematical visual purposes only (no 3D design). Future trail will not be depicted <br />on construction plans or cross sections. <br />3.1.6 Recut existing groundlines along newly established alignments for Auburn Street, <br />Yale Street, Vance Street, Ulysses Street and Smith Street. <br />3.1.7 Review CSAH 33 profile based upon adjusted alignment. Areas of specific concern <br />include at Ulysses Street (sight lines) and east of Quincy Street where CSAH 33 <br />splits two residential driveways. (Assumes alignment shift is approved at 10 or 11 <br />feet, onetime update.) <br />3.1.8 Extend alignments and update profiles for Auburn Street, Yale Street, Vance Street, <br />Ulysses Street and Smith Street due to CSAH 33 alignment/profile shifts. <br />3.1.9 Recompute intersection sightlines at each intersection (excludes CSAH 13) due to <br />alignment and profiles revisions. Make corrective updates deemed appropriated <br />for alignment and/or profiles (mainline or side street). <br />3.1.10 Update Civil 3D models to incorporate urban typical section and 5-foot boulevard <br />along south side of CSAH 33 from approximately 350 feet west of Auburn Street <br />east to Quincy Street. <br />3.1.11 Update Civil 3D models to develop urban section from approximately 1OO feet west <br />of cattle pass east to the roundabout. <br />3.1.12 Update proposed right of way linework in right of way basefile to reflect alignment <br />shifts where appropriate. <br />3.1.13 Recut cross sections (existing groundlines and proposed) along revised alignment <br />and profile. Review sections, make appropriate revisions or adjustments. Cut <br />sections to plan sheets. <br />Work Tasks and Person -Hour Estimates <br />'SRF <br />13725.00 <br />PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH. SUPPORT TOTALS EST. FEE <br />6 - - 20 <br />- - - - <br />- 26 <br />$4,044.00 <br />4 - - 4 <br />- - 8 - <br />- 16 <br />$2,192.00 <br />5 <br />5 <br />$720.00 <br />4 - - 12 <br />- - - - <br />- 16 <br />$2,504.00 <br />- - - 6 <br />- 8 - - <br />- 14 <br />$1,744.00 <br />- - - 1 <br />- 4 - - <br />- 5 <br />$584.00 <br />2 - - 16 <br />- - - - <br />- 18 <br />$2,692.00 <br />- - - 2 <br />- 8 - - <br />- 10 <br />$1,168.00 <br />- - - 4 <br />- 12 - - <br />- 16 <br />$1,896.00 <br />- - - 8 <br />- - - - <br />- 8 <br />$1,152.00 <br />- - - 16 <br />- - - - <br />- 16 <br />$2,304.00 <br />- - - 1 <br />- 4 - - <br />- 5 <br />$584.00 <br />2 - - 16 <br />- - - - <br />- 18 <br />$2,692.00 <br />13725 Amd_2_Rev3.alsx <br />SRF CONSULTING GROUP, INC. MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.