My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.5 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:58 AM
Creation date
10/13/2022 2:53:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/302022 Exhibit B-1 Page 5 of 12 <br />SRF Consulting Group, Inc. <br />Client: Sherburne County <br />Project: CSAH 33 Auburn Street to CSAH 13 (Twin Lakes Road) <br />Amendment No. 2 - Future Trail / Storm Sewer Design <br />Subconsultants: <br />TASK NO. TASK DESCRIPTION <br />3.0 DESIGN <br />Assumptions: <br />- Realignment of CSAH 33 (up toll feet north) is requested from 350 feet west of <br />Auburn Street thru Smith Street and sections along the new corridor prior to the <br />roundabout to accommodate the future trail along south side of CSAH 33. <br />- Right of way linework needs to be updated for CSAH 33 centerline shift. <br />- No intersection lighting required at side streets. <br />- No trail surfacing or subbase (aggregate or bituminous) is planned. <br />- An urban section consisting of curb and gutter along south edge of shoulder from <br />approximately 350 feet west of Auburn Street east through the intersection of <br />Quincy Street is planned for accommodating the future trail. Additional sections of <br />urban (curb and gutter) are planned from approximately 100 feet of the planned <br />cattle pass east to the roundabout. <br />- Urban boulevard width will be a typical 5 feet measured from face of curb to the <br />grading PI for the section of CSAH 33 from the TH 169 exit ramp east thru Quincy <br />Street. <br />- Trail is not carried anyfurtherthan a graphical representation (2D) <br />- Additional stormwater treatment locations, including pond(s) will be reviewed to <br />accommodate both the current project and future trail construction. Storm water <br />treatment locations will be located and designed to provide flexibility for the current <br />and future expansion abilities. <br />- Adjust two previously proposed stormwater treatment ditches to accommodate <br />road shift to the north. Proposed design does NOT account for treatment of future <br />trail impervious. <br />- No pedestrian ramps or ADA design are included forthe futuretrail. <br />- Engineer's Estimate and Statement of Estimated Quantities (SEQ) will be expanded <br />to provide separate quantity columns for County & City cost participation for CSAH <br />33 and separate column for County participation on CSAH 13. <br />- No specific driveway design required for future trail considerations. SRF will cut <br />sections at driveways for new CSAH 33 alignment and review driveway slopes for <br />general conformity for future trail. Minor grade adjustments will be reviewed (if <br />necessary) to facilitate the future trail as deemed reasonable with this project. <br />- No modifications to the roundabout are included with this additional scope. <br />- QC reviews are included in each task as necessary. <br />- No bench will be graded into the back slope alongthe rural section east of Quincy <br />Street forthe future trail. <br />Work Tasks and Person -Hour Estimates <br />PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH. <br />'SRF <br />13725.00 <br />SUPPORT TOTALS EST.FEE <br />13725 Amd_2_Rev3.alsx <br />SRF CONSULTING GROUP, INC. MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.